49 SPADINA AVE
REVISION 1: REVISION TO PERMIT 26 118021 PLB 00 PS / 26 118021 HVA 00 MS TO ADD WASHROOM TO PERMIT AS NOTED IN 26 118021 BLD 00 BAHVAC - Proposed interior alterations to an office space. Scope of w…
Showing first 18 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 1: REVISION TO PERMIT 26 118021 PLB 00 PS / 26 118021 HVA 00 MS TO ADD WASHROOM TO PERMIT AS NOTED IN 26 118021 BLD 00 BAHVAC - Proposed interior alterations to an office space. Scope of w…
HVAC - Proposed interior alterations to an office space. Scope of work includes demolition of walls, creation of new rooms, replacement of existing doors, new plumbing and modified entry/reception …
Proposed interior alterations to an office space. Scope of work includes demolition of walls, creation of new rooms, replacement of existing doors, new plumbing and modified entry/reception - suite…
Mechanical layout update to unit 301, existing office space
Plumbing - Proposal for interior alterations to create 3 new unisex washrooms on the fifth floor
Proposal for interior alterations to create 3 new unisex washrooms on the fifth floor (unit 502).
HVAC - Proposal for interior alterations to create 3 new unisex washrooms on the fifth floor
Interior structural work to base building, to portion of basement and ground floor, and construct new entrances on West elevation (Spadina Ave).- no occupancy of the area. (for future retail altera…
Proposal for interior alterations to basement for 2 washrooms and bicycle storage "The Portland Center" (5m2)
Plumbing - Proposal for interior alterations to basement for 2 washrooms and bicycle storage "The Portland Center" (5m2)
Revision to construct a washroom on ground floor of existing building.
Revision to HVAC to add a washroom on the ground floor.
HVAC - Proposal for interior alterations to basement for 2 washrooms and bicycle storage "The Portland Center" (5m2)
Construct a 5-storey exit facility (1st - 5th storeys) and single-storey loading facility (ground floor) addition to existing office building.Separate sprinkler permit required - charged on this pe…
HVAC - Proposal to construct a 5-storey exit facility (1st - 5th storeys) and single-storey loading facility (ground floor) to existing office building
Permit for interior alterations and construction of mezzanine - vacant space- commercial school - UNITC
HVAC - Permit for interior alterations and construction of mezzanine - vacant space- commercial school - UNITC
CANCELLED BY APPLICANT. THERE IS NO HVAC ALTERATIONS.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.