56 CENTENNIAL PARK RD
REV 02: Adding drainage structures and features to ensure that the existing pumphouse containing the new skate trail pumping system does not flood as it did in the past. The existing firehydrant, v…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 02: Adding drainage structures and features to ensure that the existing pumphouse containing the new skate trail pumping system does not flood as it did in the past. The existing firehydrant, v…
Proposal to demolish one washroom building at park locationRefer to 26 218290 BA - to install two (2) prefabricated washroom buildings each containing 2 separate
Install one 30'x40' temporary tent for media from May 21st-June 5th, 2026
Drain - Proposed new washroom building and all associated structural, mechanical and electrical work.
REV 01: In chalet building, demolish existing buried copper piping including fitting that cross the new foundation walls at the chalet building. Piping to be demolished up to 300mm from both sides …
Geothermal - work to support outdoor sports park - FIFA
Drain - Proposed renovations and extension of existing park buildings.
Plumbing - Proposed renovations and extension of existing park buildings.
HVAC - Proposed renovations and extension of existing park buildings.
Proposed renovations and extension of existing Park buildings.
Drain - Proposed renovations and extension of existing park buildings.
Proposed new washroom building and all associated structural, mechanical and electrical work.
Plumbing - Proposed new washroom building and all associated structural, mechanical and electrical work.
HVAC - Proposed new washroom building and all associated structural, mechanical and electrical work.
Plumbing - PROJECT INVOLVES THREE ADDITIONS: 2 new barrier-free change rooms; 1 new Zamboni garage; reconfiguration/augmentation to the existing public washrooms to provide washrooms that meet acce…
Roof replacement, metal cladding replacement, and clerestorey window replacement to existing recreational building
Proposal to construct storage building (without occupancy) under BMX ramp for Panam Games.
Revision 01 re; Exit stairs fire separation etc...Interior alterations to ski chalet including new stairs, door and frame replacements, new counters in washrooms, interior building repairs, new eme…
Interior alterations to ski chalet including new stairs, door and frame replacements, new counters in washrooms, interior building repairs, new emergency lighting
REVISION to layout of piping due to location of water supply and to include (1) backflow prevention device.Replace water and sanitary piping lines to an existing Wading Pool to Centennial Park.
Page numbers are hidden until the total count is available from the data service.