Plumbing - Proposal for interior alterations, fitout for new office.
HVAC - Proposal for interior alterations, fitout for new office.
REV06: Proposed revision for minor re-allocation of parking and loading spaces to suit actual use of areas. Changes result in loss of 2 parking spaces, however, overall zoning bylaw parking and loa…
Revision 03: Revision to include addition of storm manhole on north side of Block E for Block roof leader connection.
HVAC - Proposal for interior alterations to office space (main and second floor).
Proposal for interior alterations to office space (main and second floor).
Revision 05 - layout changes for Block A Rev 04 - Structural changes related to the submitted building with repairs/changes see structural, architectural and electrical drawingsREVISION 03 : stuctu…
Revision - Wahsroom and plumbing fit out locations have been reivsed to suit units. Rev 05 - Plumbing changes for Block A related to the submitted building with repairs/changes in the system.REVISI…
Rev 05 - Plumbing changes for Block A related to the submitted building with repairs/changes in the system.REVISION 04: The block originally had eight units, but we have decided to split three doub…
Rev 04 - Structural changes related to the submitted building with repairs/changes see structural, architectural and electrical drawingsREVISION 03 : stuctural changes for block AREVISION 02: The b…
REVISION 6 - Changes to the parking and loading provisions for the increased office use. [ 41 office units and 9 industrial/warehouse unit on the lot]<<The proposed development consists of 58 2-sto…
REVISION 03 : stuctural changes for block AREVISION 02: The block originally had 8 units, but we have decided to split 4 double units into eightsingle units. As a result, there are now a total of 1…
Proposed interior alterations for Block A - Unit 1 Tenant Fitout.
HVAC - Proposed interior alterations for Block A - Unit 1 Tenant Fitout.
REVISION - interior layout changesInterior alterations for storage with ancillary office on the second floor - unit 13 (Block C - construction Unit 29)
REV 01: Proposal to open stair by removing doors top and bottom of stair and enclosingwall, modified sprinkler system and addition of 460 mm high smoke baffle around stair opening & addition of int…
Revision 02 - Added rough-in plumbingRevision - match as built and FFR as per inspectors request
See the attached folder
Administrative permit. The owners of unit 3, have agreed to share a door/access with units 45. This will facilitate better accessibility and convenience for both parties involved.