285 SPADINA RD
Temporary Tent to be erected Sep 26th 2025 and used on Wedding day Sep 27th 2025, take down Sep, 28th 2025
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Temporary Tent to be erected Sep 26th 2025 and used on Wedding day Sep 27th 2025, take down Sep, 28th 2025
Proposal to construct a second storey addition and rooftop patio.
Revision 01- required in order to accomodate new foundation around 1800mm storm pipe and floor drain additions added around E2.HVAC - The purpose of Spadina Easier Access project is to built the ba…
Revision 01- required in order to accomodate new foundation around 1800mm storm pipe and floor drain additions added around E2.The purpose of Spadina Easier Access project is to built the barrier f…
Revision 01 - required in order to accomodate new foundation around 1800mm storm pipe and floor drain additions added around E2.Drain - The purpose of Spadina Easier Access project is to built the …
Revision 01- Plumbing - The purpose of Spadina Easier Access project is to built the barrier free vertical transportation between each level of the station. The design includes a new passaenger ele…
HVAC - PROPOSED ADDITION TO SECOND FLOOR. ROOFTOP PATIO, INTERIOR ALTERATIONS THROUGHOUT. EXISTING VACANT UNIT TO BE CONVERTED INTO RESTAURANT GREATER THAN 30 SEATS
PROPOSED INTERIOR ALTERATIONS THROUGHOUT, EXISTING VACANT UNIT TO BE CONVERTED INTO RESTAURANT GREATER THAN 30 SEATS.
Plumbing - PROPOSED ADDITION TO SECOND FLOOR. ROOFTOP PATIO, INTERIOR ALTERATIONS THROUGHOUT. EXISTING VACANT UNIT TO BE CONVERTED INTO RESTAURANT GREATER THAN 30 SEATS
Roof and brick repair at Spadina Station - Gash House entrance
Proposed basement underpinning and interior alterations.
Addition to existing building to include LULA lift and stairs. Interior renovation to include barrier free washroom.
Plumbing - Addition to existing building to include LULA lift and stairs. Interior renovation to include barrier free washroom.
HVAC - Addition to existing building to include LULA lift and stairs. Interior renovation to include barrier free washroom.
Permit for shoring works only - After relocating site services and utilities (BP 21-181573 BA), the contractor will drill and install shoring to support excavation for two underground elevators tha…
Proposal for new elevator addition on north side of existing garage building, interior renovation and two new parking stalls.
Install one cerrtified tent 20'x60' Standard Pipe Frame Tent (Cert #14-251050), anchored with concrete blocksInstalled from Sept 3 to 5, 2021.
HVAC - The purpose of Spadina Easier Access project is to built the barrier free vertical transportation between each level of the station. The design includes a new passaenger elevator in each pla…
The purpose of Spadina Easier Access project is to built the barrier free vertical transportation between each level of the station. The design includes a new passaenger elevator in each platform (…
Drain - The purpose of Spadina Easier Access project is to built the barrier free vertical transportation between each level of the station. The design includes a new passaenger elevator in each pl…
Page numbers are hidden until the total count is available from the data service.