89 YONGE ST
REV02: Revision to 25 231979 BLD 01 BA to incorporate a turnstile at the concourse entrance. See Alternative Solution permit 26-198517-ASRev 01 - Reconfigure the existing building into a conference…
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV02: Revision to 25 231979 BLD 01 BA to incorporate a turnstile at the concourse entrance. See Alternative Solution permit 26-198517-ASRev 01 - Reconfigure the existing building into a conference…
REVISION - UPGRADE EXISTING SPRINKLER SYSTEM BASED ON NEW LAYOUTProposed interior renovation to the existing finance and human resources staff work areas in the lower level of the library.
Rev 03 to to revise Water Meter & Back Flow PreventerRev 02 to revise sump pit locationRev 01 - Reconfigure the existing building into a conference centre in the concourse level, wellness lounge an…
HVAC - Proposed interior alteration of two staff rooms
Plumbing - Proposed interior alteration of two staff rooms
Proposed interior alteration of two staff rooms
Rev 02 to revise sump pit locationRev 01 - Reconfigure the existing building into a conference centre in the concourse level, wellness lounge and change rooms on the ground floor and gym on the sec…
HVAC - Proposed interior alteration for Osteo Tuina Therapist Clinic - including HVAC, plumbing, Sprinkler
Proposed interior alteration for Osteo Tuina Therapist Clinic - including HVAC, plumbing, Sprinkler
Plumbing - Proposed interior alteration for Osteo Tuina Therapist Clinic - including HVAC, plumbing, Sprinkler
Proposed interior renovation to the existing finance and human resources staff work areas in the lower level of the library.
HVAC - Proposed interior renovation to the existing finance and human resources staff work areas in the lower level of the library.
Plumbing - Proposed interior renovation to the existing finance and human resources staff work areas in the lower level of the library.
Rev 01 - Reconfigure the existing building into a conference centre in the concourse level, wellness lounge and change rooms on the ground floor and gym on the second floor. Work is mostly limited …
Rev 01 - Reconfigure the existing building into a conference centre in the concourse level, wellness lounge and change rooms on the ground floor and gym on the second floor. Work is mostly limited …
Rev 01 - Reconfigure the existing building into a conference centre in the concourse level, wellness lounge and change rooms on the ground floor and gym on the second floor. Work is mostly limited …
HVAC - Removal of existing escalator/stair, removal of concourse sotrefront and removal of all HVAC,Landlord to renovate the building back to base building, new tenants will apply for interior alte…
Removal of existing escalator/stair, removal of concourse sotrefront and removal of all HVAC,Landlord to renovate the building back to base building, new tenants will apply for interior alteration …
Plumbing - Removal of existing escalator/stair, removal of concourse sotrefront and removal of all HVAC,Landlord to renovate the building back to base building, new tenants will apply for interior …
HVAC - Proposal for interior alterations to the 3rd floor of an existing assembly building - "The Elgin Winter Garden Theatre"
Updated Nov 17, 2026