900 BAY ST
Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler.
- Permit number
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler.
Proposal for sprinklers for Hearst Tower Level 3-7.
Proposal for sprinklers for Hearst Tower Level 8-11.
Proposal for sprinklers for Hepburn Tower Level 3-7.
Proposal for sprinklers for Hearst Tower Level 8-10.
Proposal for maglock installation: six maglocks for Levels 3-8 and six maglocks for Levels 9-15 (Ferguson Tower)
Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 1…
Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 1…
Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 1…
REVISION - as per the attached cover letterProposed Interior Fit-out to existing floors 17 to 24 (inclusive).
REVISION - as per the attached cover letterHVAC - Proposed Interior Fit-out to existing floors 17 to 24 (inclusive).
REVISION - as per the attached cover letterPlumbing - Proposed Interior Fit-out to existing floors 17 to 24 (inclusive).
HVAC - INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11
HVAC - INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7
Revision 01: Permit revision to 25 -238578 BLD and HVACProposed interior alterations for interior fit-out for following areas:- Podium - ground floor (between grids 34 to 42 & N TO V) and 2nd floor…
Plumbing - INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7
Plumbing - INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10
Plumbing - INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7
INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10
HVAC - INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7
Page numbers are hidden until the total count is available from the data service.