360 MONTROSE AVE
Demolition of existing two storey mixed-use building. Construction of new three storey mixed-use building.
Showing at least 1–20 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Demolition of existing two storey mixed-use building. Construction of new three storey mixed-use building.
Rev 01: new basement bachelor unitProposal to demolish existing two-storey apartment building and construct a new four storey apartment building with eight residential units. Demolition not part of…
Partial Demolition of existing building, and new construction of a City of Toronto Community Centre with a two major anchor programs; a Natatorium andGymnasium. The building will be four stories an…
DEMOLITION OF EXISTING 2-STOREY SEMI-DETACHED DUPLEXES (4 DWELLING UNITS) AND NEW CONSTRUCTION OF 3-STOREY SMALL APARTMENT BUILDING (10 DWELLING UNITS)
Proposal to demolish existing two-storey apartment building and construct a new four storey apartment building with eight residential units. Demolition not part of this scopeSee also 23-221536 STE …
Proposed demolition of existing 1 storey brick school with parking area and construction of new 2 storey replacement elementary school and child care centre, complete with associated parking (48 sp…
Proposed demolition of an existing 1-storey Keg restaurant and the construction of a new 1-storey Keg restaurant.
Demolition of existing three storey building and construction of new nine storey mixed use building with non-residential, 8300 m2 of residential area to be used for affordable housing - Scott Missi…
The Highland Creek Fluidized Bed Incineration Project and South Facility Upgrades Project include the demolition of the existing Heat Treatment Building (under separate permit), and construction of…
Rev 06 - Removal of the level 2 amenity Mag LocksDemolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
REVISION#5 To remove the circular staircase from ground floor to second floor and changed the layout of the CACF room. Demolition of existing vacant building and construction of a new 9 storey resi…
REVISION#4: REVISIONS TO MECHANICAL PENTHOUSE DOORDemolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
Rev 3: Applied to clear OTC from inspectionsDemolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
Rev 02: Revision to clarify insulationRevisions to sprinkler/fire systems review to existing permitDemolition of existing vacant building and construction of a new 9 storey residential condominium …
Revisions to sprinkler/fire systems review to existing permitDemolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
Rev 04 - Revision to relocate office.Demolition of existing place of worship and construction of new 1844.21m2 (total) place of worship.1280.50m2 ground floor gfa.
REV 03 - Proposed revision for Fire Protection - Sprinkler Systems - to add dry sprinkler heads to north, south and east canopies.Demolition of existing place of worship and construction of new 184…
REVISION #2: INTERIOR FINISHES - Building 7 New deities housing within the buildingRev 01 - Proposed revision as per drawings.Demolition of existing place of worship and construction of new 1844.21…
Rev 01 - Proposed revision as per drawings.Demolition of existing place of worship and construction of new 1844.21m2 (total) place of worship.1280.50m2 ground floor gfa.
Demolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground levelPartial occupancy of par of P3 - 4th Floor 21139902AOPartial Occupancy p…
Page numbers are hidden until the total count is available from the data service.