642 BRIAR HILL AVE
REV01: Proposed revision for as-built structural work.INTERIOR AND EXTERIOR RENOVATIONS TO EXISTING 2 STOREY HOME.
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV01: Proposed revision for as-built structural work.INTERIOR AND EXTERIOR RENOVATIONS TO EXISTING 2 STOREY HOME.
REV 01: Revisions as per bubbled drawingsHVAC - Proposal to demolish existing dwelling and construct a new three-storey single family dwelling with second-floor and third-floor balconies, rear yard…
Plumbing - Ground floor and basement addition, rear deck and interior alterations
REV:Proposed new Caledonia GO Station.
Interior alterations to units 101 & 102 for building 204 King St E.
HVAC - Interior alterations to units 101 & 102 Ifor building 204 King St E.
Proposed structural modifications for the home lift installation in the Single Dwelling Unit
Proposed replacement of existing sprinkler header, valves, compressor, piping, standpipe and pipe schedule sprinkler system with new sprinkler header, valves, compressor, piping, standpipe and hydr…
NEW CONSTRUCTION FOURPLEX
Drain - NEW CONSTRUCTION FOURPLEX
HVAC - NEW CONSTRUCTION FOURPLEX
Plumbing - NEW CONSTRUCTION FOURPLEX
DEMOLISH EXISTING SFD TO BUILD A NEW CONSTRUCTION FOURPLEX
ADDITION AND INTERIOR ALTERATION OF EXISTING 2-STOREY SINGLE FAMILY DWELLING
Rev 04 - Removal of legal secondary suite within basement space and re-instatement of stairs from basement to first floorREV: Proposal to relocate main floor powder room, relocate 2nd floor laundry…
HVAC - PROPOSED 2 STOREY SFR DWELLING
Revision 2. change is only to the site plan, showing changes to lanscape paving in the front yard only.Revision 1: modify front elevations only, change exterior cladding from stucco to brick veneer…
Rev 01: As-built revision of permit "26 124055 BLD 00 SR" to include the missing powder room on the main floor and reflect the as-built layout of the basement.Proposed underpinning and interior alt…
Revision 01 - Revision for fire separation clarification.---------------------------------------------------------------Proposal for a new two-storey dwelling with secondary suite, rear deck, side-…
Plumbing - Interior tenant improvment for single tenant, on part of the 8th floor and full 9th and 10th floors.Scope includes stair infill, non-load beaing partition construction, re-alignment and …
Updated Nov 22, 2026