100 FRONT ST W
FS - Sprinkler Shop Drawing - Interior renovation of the retail corridor off of the east entrance at the lobby level.
Showing at least 1–20 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
FS - Sprinkler Shop Drawing - Interior renovation of the retail corridor off of the east entrance at the lobby level.
Plumbing - Proposal for interior alterations to hotel.
HVAC - Proposal for interior alterations to hotel.
Proposal for interior alterations to hotel.
Plumbing - Interior renovation of the retail corridor off of the east entrance at the lobby level.
Interior renovation of the retail corridor off of the east entrance at the lobby level.
HVAC - Interior renovation of the retail corridor off of the east entrance at the lobby level.
Proposal for end-of-life like-for-like capacity replacement of pool ventilation and dehumidification unit. Conversion from air-cooled to water-cooled. Heating source remains hydronic.
HVAC Revision 03 - Revised Gas schematics and plumbing venting. Revised floor drains. Revised HVAC supply and ducting layouts. ----------------------------------------------------------------------…
Plumbing Revision 01 - Revised Gas schematics and plumbing venting. Revised floor drains. Revised HVAC supply and ducting layouts. ------------------------------------------------------------------…
Revision 02 - Change to Control Valve schedule which removes all previously noted supervisory valves.----------------------------------------------------------------------REVISION - New, metal clad…
Proposed rehabilitation of the Royal York Hotel's Steam Tunnel along York Street, the west side of the building. Work includes replacement of service tunnel wall, repair to concrete encasement of s…
REVISION - New, metal clad, exterior chimney to be installed on North side of building. Minor adjustment to shaft wall locations.Proposed renovations to existing basement mechanical room SB-Level. …
Plumbing - Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to b…
REVISION - New, metal clad, exterior chimney to be installed on North side of building. Minor adjustment to shaft wall locations.HVAC - Proposed renovations to existing basement mechanical room SB-…
INSTALLATION OF TEMPORARY TRUSS STRUCTURE TO SUPPORT BANNER FOR TIFF REDCARPET EVENTSEP 10 2023 ONLY
HVAC - Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be en…
Proposed renovations to existing basement mechanical room SB-Level. New interior partitions for emergency generator room. Renovations to existing low mechanical penthouse. Penthouse to be enlarged …
Replacement of one existing ventilation supply air unit that is at the end of functional life. Like for like capacity and function.
Demolition of existing MEP work and installation of modern new replacment MEP for better energy efficiency.
Page numbers are hidden until the total count is available from the data service.