Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION - Remove New Rear Meat Prep, New Rear Meat Cooler, New HWT Room, New AP Meat Freezer, New AP Meat Cooler, New AP Meat Prep, New AP Meat Utility, New Baker Freezer and extension of Produce …
REVISION 4 - Remove New Rear Meat Prep, New Rear Meat Cooler, New HWT Room, New AP Meat Freezer, New AP Meat Cooler, New AP Meat Prep, New AP Meat Utility, New Baker Freezer and extension of Produc…
REVISION - Remove New Rear Meat Prep, New Rear Meat Cooler, New HWT Room, New AP Meat Freezer, New AP Meat Cooler, New AP Meat Prep, New AP Meat Utility, New Baker Freezer and extension of Produce …
Revision - change 'Exist Seafood Freezer 916' from existing to demolished, include slab demo. Update D1.1 to show removal of existing ceilings in '913 Existing Meat Cooler', 'Existing Meat Prep 925…
HVAC - Proposal to construct interior alterations to Joey Turks Restuarant
Proposal to construct interior alterations to Joey Turks Restuarant(30 May 2024) applicant confirmed the proposed seatings are 30 seats or less. No major occupancy group change.
Plumbing - Proposal to construct interior alterations to Joey Turks Restuarant
Revision - remove seafood department/prep spaces from the proposed plans. Adjusted the Meat utility/butcher space to suit existing layouts. Reverted layout of sales floor back to original for refri…
REVISION - replacing all refrigeration cases with new, update system with new CO2 and update back of house with cylinderInterior alterations - removing, relocationg and adding new freezer/coolers a…
Proposed installation of a back flow preventer (Marks Work Warehouse).
To construct two mixed-use buildings on the Phase 1A and 1B lands consisting of 45 and 48 storey towers and containing 975 residential units, and 72,110 sq m of gross floor area (GFA), including 70…
Interior alterations - removing, relocationg and adding new freezer/coolers and prep spaces for Walmart.
HVAC - Interior alterations - removing, relocationg and adding new freezer/coolers and prep spaces for Walmart.
Plumbing - Interior alterations - removing, relocationg and adding new freezer/coolers and prep spaces for Walmart.
Proposal to install new refrigeration roof top unit
HVAC - Proposal to install new refrigeration roof top unit
ZR Planning Folder Draft Plan of Subdivision application to create 10 blocks to permit a mixed-use development on the lands at 1900 Eglinton Ave E (Calloway/SmartCentres), including three (3) block…
HVAC - Interior alterations to add tote wash sink, add RTU, relocate training room, add ne CBL room, revision to underground piping in BCN area, adjustment to ground entrance railings, infill garde…
Plumbing - Interior alterations to add tote wash sink, add RTU, relocate training room, add ne CBL room, revision to underground piping in BCN area, adjustment to ground entrance railings, infill g…
Page numbers are hidden until the total count is available from the data service.