200 LONSDALE RD
Install (1) 60'x180', (1) 10'x100', (1) 10'x120', (2) 20'x60', (1) 20'x20' Temporary Tents for an event at the Upper Canada College from June 9th 2025 to June 14, 2025.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Install (1) 60'x180', (1) 10'x100', (1) 10'x120', (2) 20'x60', (1) 20'x20' Temporary Tents for an event at the Upper Canada College from June 9th 2025 to June 14, 2025.
Interior alterations on the ground floor, second floor (shaft only) and rooftop mechanical unit replacement works - Two storey Prep School
HVAC - Interior alterations on the ground floor, second floor (shaft only) and rooftop mechanical unit replacement works - Two sotrey Prep School
Plumbing - Interior alterations on the ground floor, second floor (shaft only) and rooftop mechanical unit replacement works - Two sotrey Prep School
TO PERMIT INTERIOR ALTERATIONS FOR THE EXISTING FOUR-SUITES WITH EXTERIOR REPAIRS AT THE EXISTING 2-STOREY BEATTY FACULTY RESIDENCE BUILDING.
Plumbing - TO PERMIT INTERIOR ALTERATIONS FOR THE EXISTING FOUR-SUITES WITH EXTERIOR REPAIRS AT THE EXISTING 2-STOREY BEATTY FACULTY RESIDENCE BUILDING.
HVAC - TO PERMIT INTERIOR ALTERATIONS FOR THE EXISTING FOUR-SUITES WITH EXTERIOR REPAIRS AT THE EXISTING 2-STOREY BEATTY FACULTY RESIDENCE BUILDING.
Interior alterations on the second floor and rooftop mechanical unit replacement works at the existing 2 storey prep school building
HVAC - Interior alterations on the second floor and rooftop mechanical unit replacement works at the existing 2 storey prep school building
New 2-Storey private academic building with below grade parking, loading, and service space. The proposed building is located on the existing private school campus at Upper Canada College. The tota…
Install temporary tent structure for Upper Canada College gradutation ceremony from May 18th to May 30th, 2022
Plumbing - Interior alterations to east wing classroms, offices and corridors (including the attice space) - Upper Canada College
Interior alterations to east wing classroms, offices and corridors (including the attice space) - Upper Canada College
HVAC - Interior alterations to east wing classroms, offices and corridors (including the attice space) - Upper Canada College
HVAC - Construct interior alterations to existing admissions office for Upper Canada College (202m2)
Proposal for interior alterations to the 2nd and 3rd floor student residences/apartments - "Upper Canada College."
HVAC - Proposal for interior alterations to the 2nd and 3rd floor student residences/apartments - "Upper Canada College"
Plumbing - Proposal for interior alterations third floor classrooms and staff rooms of exisiting school (320.0m2). Also included is the installation of a new exhaust fan in the attic. A seperate sp…
Proposal for interior alterations third floor classrooms and staff rooms of exisiting school (320.0m2). Also included is the installation of a new exhaust fan in the attic. A separate sprinkler per…
Plumbing - Permit for interior alterations to Upper Canada College - Room Numbers 303, 307 and 309 - convert existing classrooms to science rooms (Classrooms)
Page numbers are hidden until the total count is available from the data service.