2150 BLOOR ST W
7 SIGNS = 2 wall signs on 1st storey, south elevation, 2 window signs on 1st storey, south elevation, 1 wall sign 1st storey, West elevation, 1 Wall sign 2nd storey, West elevation, 1 projecting si…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
7 SIGNS = 2 wall signs on 1st storey, south elevation, 2 window signs on 1st storey, south elevation, 1 wall sign 1st storey, West elevation, 1 Wall sign 2nd storey, West elevation, 1 projecting si…
1 wall sign + 1 projecting sign**TIM HORTONS**
HVAC - Interior alterations of an existing suite - including HVAC, plumbing and electrical work - Tim Horton's
Interior alterations of an existing suite - including HVAC, plumbing and electrical work - Tim Horton's
Plumbing - Interior alterations of an existing suite - including HVAC, plumbing and electrical work - Tim Horton's
Proposal for interior alterations to an existing vacant commecial unit for new restaurant, less than 30 seats - "Dickey's Barbeque Pit"
Plumbing - Proposal for interior alterations to an existing vacant commecial unit for new restaurant, less than 30 seats - "Dickey's Barbeque Pit"
HVAC - Interior alterations to an existing tenancy for future fit out
Proposal to replace and repair retaining wall at the rear
REVISION - changes to the stair designProposal for interior alterations to the add a new exit stair on the south/east corner of the existing multiple use building.
Proposal for interior alterations to the add a new exit stair on the south/east corner of the existing multiple use building.
Proposed new fire alarm control system installation and sprinkler system modification for existing mulitple unit - non residental building,
Proposed HVAC retrofit.
HVAC - Interior alterations to existing unit to create a yoga studio
Interior alterations to existing unit to create a yoga studio
Plumbing - Interior alterations to existing unit to create a yoga studio
Plumbing - Interior alterations for new tenant *Daniels HR Corporaton* new home sales centre
Proposed installation of (2) roof top units and partial installation of corresponding duct work. Duct work to be capped off once inside building. Refer to #11-284092 for additional duct work inform…
Construction of a convenience exterior stairs w/ glass canopy to give direct access from Bloor Street + Conversion of existing basement area from office to retail space (Partitioning and interior a…
Replace 5 windows with 4 windows and 2 double doors to front of existing building. Interior alterations to interior partition walls and ceiling to accomodate 2 new beams.
Page numbers are hidden until the total count is available from the data service.