Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for Enwave Simcoe Street Plant - Electrical Room Modifications (Enwave Energy Corporation)
Proposal for Enwave Simcoe Street Plant - Electrical Room Modifications (Enwave Energy Corporation)
FS - Sprinkler Shop Drawing - Provision of new equipment platform for electric boiler - Enwave Energy Corporation
HVAC - Provision of new equipment platform for electric boiler - Enwave Energy Corporation
Provision of new equipment platform for electric boiler - Enwave Energy Corporation
PROPOSED: 1 CERTIFIED TEMPORARY TENT. 30 X 60 ARCHTOP FRAME TENT (CERT#14 251040) WITH OPEN WALLS INSTALLED - NOVEMBER 25TH, 2020 - MAY 25TH, 2021. ANCHORED WITH CONCRETE BLOCKS.
HVAC - Proposal to construct a new platform to service the mechanical unit for a proposed hot water and heat recovery chiller plant
Proposal to construct a new platform to service the mechanical unit for a proposed hot water and heat recovery chiller plant
Proposal to install a new chiller with circulating condenser water pumps, piping and wiring.
Plumbing - Proposal to construct a 1 storey addition (plus below grade) for a new elevator and lobby in an existing multiple use, commercial building - "Metro Toronto Convention Centre"
HVAC - Proposal to construct a 1 storey addition (plus below grade) for a new elevator and lobby in an existing multiple use, commercial building - "Metro Toronto Convention Centre"
Proposal to construct a 1 storey addition and interior alterations below grade for a new elevator and lobby in an existing multiple use, commercial building - "Metro Toronto Convention Centre"
Proposal for interior alterations to floors 350, 400, 500, 600, 700, and 800 levels in existing multiple use building. "Metro Toronto Convention Centre" Scope of work includes replacing existing me…
Proposal to install 24 mag locks on the 700 level (existing maglocks being re-used), and 15 mag locks on the 800 level (existing + reused) and 15 on 600 level. Maglocks are being reused as doors ar…
RENOVATION OF EXISTING SOUTH KITCHENREVISIONS TO EXISTING PERMIT TO ALLOW FOR INSTALLATION OF NEW WET CHEMICAL FIRE SUPPRESSION SYSTEM OVER FRYERS IN EXISTING HOOD IN LIEU OF THE EXSITING WATER BAS…
HVAC - Proposal for renovation of existing south kitchen (620 sq.m).
Proposal for renovation of existing kitchen in South Building (620 sq.m).
FS - Sprinkler Shop Drawing - Proposal for interior alterations to "The Path" level, in the North and South Buildings, including a new elevator and glazing, 2 new elevators in the north building, a…
Proposal to add 1 escalator system to the existing south escalator system that connects levels 700 - 800 - Metro Convention Centre.
Page numbers are hidden until the total count is available from the data service.