225 ROSLIN AVE
Revision 02: Moved from traditional forced air system to high velocity with hydronic boiler.Revision to revise the design which interfered with the plumbing and ceiling heights.- see attached descr…
Showing at least 1–5 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 02: Moved from traditional forced air system to high velocity with hydronic boiler.Revision to revise the design which interfered with the plumbing and ceiling heights.- see attached descr…
Revision to revise the design which interfered with the plumbing and ceiling heights.- see attached description on the application form.HVAC - Proposed interior alterations including removing firep…
Proposed interior alterations including removing fireplace, closing in the 2nd floor living room floor, installing forced air/HVAC, and updating plumbing (above ground).
HVAC - Proposed interior alterations including removing fireplace, closing in the 2nd floor living room floor, installing forced air/HVAC, and updating plumbing (above ground).
Plumbing - Proposed interior alterations including removing fireplace, closing in the 2nd floor living room floor, installing forced air/HVAC, and updating plumbing (above ground).
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.