2580 KIPLING AVE
Proposal for new elevator with enclosure and new ramp to stage from auditorium with new barrier free universal toilet room.
Showing first 8 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for new elevator with enclosure and new ramp to stage from auditorium with new barrier free universal toilet room.
Removal and reinstallation of existing photovoltaic system on an existing rooftop.
Relocation of two portable classrooms, the portables are taken from another site and dropped at this proposed location.
HVAC - Installation of 2 new portable classrooms
Installation of 2 new portable classrooms (Non-Certified)
Installation of a kitchen exhaust hood at North Albion C.I.July 13/07 revised drawings submitted for hood and make up air unit
remove existing two exits on ground floor school cafeteria and replace with fixed windows
Installation of a kitchen exhaust hood at North Albion C.I.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.