369 QUEEN ST W
Proposal for HVAC re - A new commercial building, 3 stories above grade, 1 storey underground. Building area is 288.1 m², we got the building permit, the owner engages another mechanical engineer t…
Showing first 18 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for HVAC re - A new commercial building, 3 stories above grade, 1 storey underground. Building area is 288.1 m², we got the building permit, the owner engages another mechanical engineer t…
Proposal for plumbing regarding - A new commercial building, 3 stories above grade, 1 storey underground. Building area is 288.1 m², we got the building permit, the owner engages another mechanical…
Rev 08: drainage changes , Changes on wall assembly as cloudedREV07: Addition of steel beam.REVISION 06: structural changes to issued permit 13 135820 BLD R5 NB, Changes in columns, grid lines and …
Drain - Construct new 2 storey building as replacement for fire damaged building (demolished under order).Sprinkler fee charged on this permit - separate FSU permit required.****4JUN2013 - a condit…
REV07: Addition of steel beam.REVISION 06: structural changes to issued permit 13 135820 BLD R5 NB, Changes in columns, grid lines and elevator shaft wall also changes to the exterior wall type REV…
REVISION 06: structural changes to issued permit 13 135820 BLD R5 NB, Changes in columns, grid lines and elevator shaft wall also changes to the exterior wall type REVISION 5 - proposed 3rd floor, …
REVISION 2 - proposed 3rd floor, relocate stair shaft and washrooms, revised structural design, revised mechanical designRevision to enlarge 2nd floor ceiling height, alter elevations, revise found…
REVISION 5 - proposed 3rd floor, relocate stair shaft and washrooms, revised structural design, revised mechanical designConstruct new 2 storey building as replacement for fire damaged building (de…
REVISION - proposed 3rd floor, relocate stair shaft and washrooms, revised structural design, revised mechanical designPlumbing - Proposal to reconstruct 1 sty with mezzanine retail building due to…
Proposal to install 3 temporary structures on existing vacant lot from July 25/18 to Aug 7/18 - "Tweed".The structures are custom fabricated shipping containers, with signage and one with an upper …
Revision to shoring and foundation.
Revision to shoring to minimize the number of caissons. NOTE: Also see new admin permit for underpinning on adjacent property - 371-373 Queen St W 14 125324 BLD
Revision for shoring purposes.
Revision to enlarge 2nd floor ceiling height, alter elevations, revise foundation, and minor layout changes.
Revision to enlarge 2nd floor ceiling height, alter elevations, revise foundation, and minor layout changes.
HVAC - Proposal to reconstruct 1 sty with mezzanine retail building due to fire damage.
Construct new 2 storey building as replacement for fire damaged building (demolished under order).Sprinkler fee charged on this permit - separate FSU permit required.****4JUN2013 - a conditional pe…
Plumbing - Proposal to reconstruct 1 sty with mezzanine retail building due to fire damage.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.