3755 BLOOR ST W
FS - Sprinkler Shop Drawing - Proposal for Enwave district energy plant at the Etobicoke Civic Centre. Includes below grade plant room and Level 16 roof.
Showing at least 1–6 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
FS - Sprinkler Shop Drawing - Proposal for Enwave district energy plant at the Etobicoke Civic Centre. Includes below grade plant room and Level 16 roof.
Proposal for Enwave district energy plant at the Etobicoke Civic Centre. Includes below grade plant room and Level 16 roof.
Drain - Proposal for Enwave district energy plant at the Etobicoke Civic Centre. Includes below grade plant room and Level 16 roof.
HVAC - Proposal for Enwave district energy plant at the Etobicoke Civic Centre. Includes below grade plant room and Level 16 roof.
Plumbing - Proposal for Enwave district energy plant at the Etobicoke Civic Centre. Includes below grade plant room and Level 16 roof.
Geothermal Borefield for the district energy system beneath the Etobicoke Civic Centre, consisting of 190 Bores, and lateral piping.Drilling Start Date is: January 30, 2023
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.