Proposal to erect one temporary structures for mlse playoffsInstall date: April 9, 2026Removal date: July 2, 2026.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to erect one temporary structures for mlse playoffsInstall date: April 9, 2026Removal date: July 2, 2026.
Erect two temporary structures for mlse playoffs, install date April 8th tear down July 2nd, 2026.
Plumbing - Proposed renovation to L100 public galleria; L200 sher club balcony and escalator landing; L600 east suites, corridor, elevator lobby and washrooms
Proposed renovation to L100 public galleria; L200 sher club balcony and escalator landing; L600 east suites, corridor, elevator lobby and washrooms
Drain - Proposed renovation to L100 public galleria; L200 sher club balcony and escalator landing; L600 east suites, corridor, elevator lobby and washrooms
HVAC - Proposed renovation to L100 public galleria; L200 sher club balcony and escalator landing; L600 east suites, corridor, elevator lobby and washrooms
Revision: Kitchen exhaust & related fire suppression in RM 3413A (NW Kitchen)
Revision 02:Revisions to kitchen exhaust & related fire suppression in RM 3115 (Concession B/Stand 13), RM 3413A (NW Kitchen),RM 3206A (SE Kitchen), RM 3707A (SW Kitchen), RM 3229 (Concession 3), R…
Revision #2:Revision to ceiling heights in RM 3115 (Concession B/Stand 13) and RM 3413 (Grab & Go 3-Stand 18) to provide required clearance to Kitchen Equipment. F&B drawings provided for reference…
HVAC - Proposed Interior alterations at event level storage and locker areas.
Plumbing - Proposed Interior alterations at event level storage and locker areas.
Proposed Interior alterations at event-level storage and locker areas.
Revision:- Removal of certain L200 scope areas (North Lobby 2453, West Lobby 2344, Global Partnership Lounge 2458) from this phase of construction (now indicated as out of scope with gray shading a…
Revision:- Removal of certain L200 scope areas (North Lobby 2453, West Lobby 2344, Global Partnership Lounge 2458) from this phase of construction (now indicated as out of scope with gray shading a…
Revision:- Removal of certain L200 scope areas (North Lobby 2453, West Lobby 2344, Global Partnership Lounge 2458) from this phase of construction (now indicated as out of scope with gray shading a…
REV01: Proposed revision for additional HVAC ductwork, fire dampers, and grease exhaust ductworkHVAC - Proposed renovations to existing main concourse level including circulation, concessions, reta…
Proposal to install temporary container for MolsonCoors Playoffs at the Maple Leaf Square for the duration of the playoffs. April 16,2025 to end of playoffs.
FS - Sprinkler Shop Drawing - Proposal for ScotiaBank Arena - renovation to L200 ice plant, lobbies and lounge; L300 Upper Concourse incl. circulation, restrooms, concessions, retail spaces; L400 a…
Proposal to erect 2 temporary structures for MLSE Playoffs from April 9, 2025 to July 3, 2025
Proposal for ScotiaBank Arena - renovation to L200 ice plant, lobbies and lounge; L300 Upper Concourse incl. circulation, restrooms, concessions, retail spaces; L400 and L500 suites; extension of A…