Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to erect temporary mobile stage for TMU Orientation inside the TMU Community Park as per site plan. Aug.24-Aug.29 2025
Revision to replacement of existing steam condensate tank.Installation of new relief vent for existing condensate receiver tank.
This project involves the installation of a 30 ft by 75 ft pre-engineered temporary tent on grassy grounds at Toronto Metropolitan University community park - Install October 27th and removal Novem…
Proposal to erect temporary mobile stage for TMU Orientation inside the TMU Community Park as per site plan. Aug.25-Aug.30 2024
replace make up air unit and exhaust fans
The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting, updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-load-beari…
Plumbing - The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting,updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-…
HVAC - The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting,updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-load…
Installation of new relief vent for existing condensate receiver tank.
HVAC - Proposal to replace the existing diesel generator with a new 200 KW natural gas generator at the existing university "Ryerson University".
Proposal to replace the existing diesel generator with a new 200 KW natural gas generator at the existing university "Ryerson University".
Proposal to provide new 1.2 m x 1.2 m opening in existing concrete wall for new interior window installation.
FS - Sprinkler Shop Drawing - Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, conv…
Plumbing - Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is …
Proposal to demolish and remove abandoned boilers and associated piping, accessories and electrical service in the existing university building, convenience address is 350 Victoria Street.
Proposal for interior alterations to provide a caged area within an existing storage room for chemical storage.
Plumbing - Proposal for interior alterations to provide a caged area within an existing storage room for chemical storage.
Installation of 2 Backflow Prevention Devices (Water only)
Plumbing - Proposal for interior alterations to the Ryerson University, KHN-202, Chemistry Lab. This proposal includes HVAC and Plumbing.
Page numbers are hidden until the total count is available from the data service.