571 BLOOR ST W
Rev 06: see cover letterRev 05REV04: Proposed revision as per drawingsREVISION 3 - revised sprinkler drawings in accordance to AS permit 24-100651 ALTEAST BLOCK - Proposal to construct 5 residentia…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 06: see cover letterRev 05REV04: Proposed revision as per drawingsREVISION 3 - revised sprinkler drawings in accordance to AS permit 24-100651 ALTEAST BLOCK - Proposal to construct 5 residentia…
Rev 04: see cover letterREV 03: Proposed revision as per drawingsREVISION 2 - as per the attached narrativePlumbing - EAST BLOCK - Proposal to construct 5 residential rental towers (Building 2 - 24…
REV: Proposal for removal of first floor level from permit - noted area 'not in scope - future tenant'Interior Tenant Fit-out for Food Store (Bldg 3)
REV Plumbing - Interior Tenant Fit-out for Food Store (Bldg 3)
REV HVAC - Interior Tenant Fit-out for Food Store (Bldg 3)
In conjunction with the development known as Mirvish Village, proposal to erect and display 11 first party wall signs (BLDG 5)**Mirvish Village**See SMPs 24-101396 & 22-229407
Rev 04REV03: Proposed revision as per drawingsREVISION 2 - as per the attached narrativeHVAC - EAST BLOCK - Proposal to construct 5 residential rental towers (Building 2 - 24 storey, Building 3A - …
Rev 05REV04: Proposed revision as per drawingsREVISION 3 - revised sprinkler drawings in accordance to AS permit 24-100651 ALTEAST BLOCK - Proposal to construct 5 residential rental towers (Buildin…
REVISION 02: Deletion of proposed stair between P1 and P2 Levels, Additions of 2-hr fire rated partitions around existing opening to separate P1 and P2 Occupancies. Reduction of Max Occupant Load o…
REVISION 02: Deletion of proposed stair between P1 and P2 Levels, Additions of 2-hr fire rated partitions around existing opening to separate P1 and P2 Occupancies. Reduction of Max Occupant Load o…
REVISION 02: Deletion of proposed stair between P1 and P2 Levels, Additions of 2-hr fire rated partitions around existing opening to separate P1 and P2 Occupancies. Reduction of Max Occupant Load o…
1 Wall Sign
REV04: Proposed revision as per drawingsREVISION 3 - revised sprinkler drawings in accordance to AS permit 24-100651 ALTEAST BLOCK - Proposal to construct 5 residential rental towers (Building 2 - …
REV 03: Proposed revision as per drawingsREVISION 2 - as per the attached narrativePlumbing - EAST BLOCK - Proposal to construct 5 residential rental towers (Building 2 - 24 storey, Building 3A - 2…
REV03: Proposed revision as per drawingsREVISION 2 - as per the attached narrativeHVAC - EAST BLOCK - Proposal to construct 5 residential rental towers (Building 2 - 24 storey, Building 3A - 25 sto…
15 signs
REV HVAC - Interior Tenant Fit-out for Food Store (Bldg 3) - revision to issued Permit #23 111336 HVA 00 MS
REV Plumbing - Interior Tenant Fit-out for Food Store (Bldg 3)revision to issued Permit #23 111336 PLB 00 PS
REVISION 01: Interior Tenant Fit-out for Food Store (Bldg 3)
REVISION 2 - as per the attached narrativeEAST BLOCK - Proposal to construct 5 residential rental towers (Building 2 - 24 storey, Building 3A - 25 storey, Building 3B - 26 storey, Building 4 - 14 s…
Page numbers are hidden until the total count is available from the data service.