580 COMMISSIONERS ST
REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit…
Rev 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit…
REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit…
Roofing replacement form the level of the existing steel deck to the standing seam metal roofing, including new vapour barrier,new gutters, new penetration flashing details, new metal walkway with …
HVAC - Roofing replacement form the level of the existing steel deck to the standing seam metal roofing, including new vapour barrier,new gutters, new penetration flashing details, new metal walkwa…
Convert paint spray room to repair area to install a wheel allignment machine and a wheeltrans bus lift (TTC)
Plumbing - To install a wheel allignment machine and a wheeltrans bus lift (TTC)
HVAC - To install a wheel allignment machine and a wheeltrans bus lift (TTC)
Proposal for electrical work to add 8 charge points and chargers in an existing Bus Garage.
Drain - Proposed conversion of an existing 45,000 L volume diesel fuel tank to a 45,000 L gasoline tank and construction of an outdoor fueling station
Plumbing - Proposed conversion of an existing 45,000 L volume diesel fuel tank to a 45,000 L gasoline tank and construction of an outdoor fueling station
HVAC - Demolition of an existing limited use and limited application lift and associated elevator shaft and equipment. Construction of a new hydraulic passenger elevator and elevator shaft, elevato…
Installation of 2 Storm Water interceptors at 580 Commissioners steet- TTC Garage
Revision 01 - shoringDemolition of an existing limited use and limited application lift and associated elevator shaft and equipment. Construction of a new hydraulic passenger elevator and elevator …
Proposed conversion of an existing 45,000 L volume diesel fuel tank to a 45,000 L gasoline tank and construction of an outdoor fueling station
Demolition of an existing limited use and limited application lift and associated elevator shaft and equipment. Construction of a new hydraulic passenger elevator and elevator shaft, elevator machi…
Drain - Demolition of an existing limited use and limited application lift and associated elevator shaft and equipment. Construction of a new hydraulic passenger elevator and elevator shaft, elevat…
Plumbing - Demolition of an existing limited use and limited application lift and associated elevator shaft and equipment. Construction of a new hydraulic passenger elevator and elevator shaft, ele…
HVAC - Proposal to replace existing standby-generator at existing TTC Lakeshore Wheel-Trans Garage
Proposal to replace existing standby-generator at existing TTC Lakeshore Wheel-Trans Garage