621 KING ST W
Revision to redistribute occupant load on Level 16 restaurant "Lavelle". Overall Occupant Load of 426 persons. Occupant Load of 426 persons interior and exterior where at no point shall the interio…
Showing at least 1–20 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision to redistribute occupant load on Level 16 restaurant "Lavelle". Overall Occupant Load of 426 persons. Occupant Load of 426 persons interior and exterior where at no point shall the interio…
REVISION 4 - change from Trespa exterior cladding above glazing elements on the 19th floor to Longboard cladding (non-combustible)Proposal for interior alterations to the P2 level for new kitchen p…
Revision # 3 - To enlarge the Mechanical room on mezzanine level of the existing restaurant.
Revision to add sprinklers in existing restaurant.
REVISION 3 - to seperate the interior and exterior occupant loads. Toatal occupant load does not changeProposal for interior alterations to the P2 level for new kitchen prep area associated with 16…
REV - 02 Revised occupant load request (only) for the 15th and 16th floor restaurant and outdoor pool in base permit. No constrcution or change of use is proposed.
Proposal for interior alterations to the P2 level for new kitchen prep area associated with 16th floor rooftop restaurant.
HVAC - Proposal for interior alterations to the P2 level for new kitchen prep area associated with 16th floor rooftop restaurant.
Revision to enclose area on P1 level for accessory use and relocate to 15th floor. Note: See active BLD for 15th floor - 15 174119-01 BLD.Please refer to permit #11-311255 BLD 02 for transfer tof N…
Use of Trespa Meteon FR wall panels as a decorative fascia on the rooftop exterior retail unit at 621 King Street West (15-174119)
REV - 01 South east washrooms and service enclosure on the 16th floor have shifted due to base building mechanical interference. An acoustic door has been added on the 16th floor south of the washr…
Revision # 01 - To the ground and 2nd floor retail space to suit requirements of creating 2 separate retail spaces.Proposal to construct a mixed use building comprising of one 16 storey and one 11 …
Revision to ground floor to remove mechanical room and enlarge the mezzanine level as per COA.OCCUPANT LOAD - by design - 210 patrons
Suite mechanical layout revision as per attached letter.
Interior alteration - 16th floor roof top restaurant and 15th floor kitchen (Occupant Load 210, and 18 staff) , Level P1 change to stair at GF access lobby from King St West.
Interior alterations to the ground floor and addition of mezzanine level for 140 seat restaurant, "Oretta"
HVAC - Proposal for interior alterations for tenant fit up in the west retail unit on the ground floor for Credit Union.
Proposal for interior alterations for tenant fit up in the west retail unit on the ground floor for Credit Union.
To install a stand pipe system and sprinklers system throughout the entire condo building including the 15 storeys above grade with mechanical penthouse, and 5 below grade parking levels in the nor…
Proposal to construct a mixed use building comprising of one 16 storey and one 11 storey tower, and 6 levels below grade parking, which includes four levels (P1, P1 Mezz, P2 and P3) commercial park…
Page numbers are hidden until the total count is available from the data service.