69 BLOOR ST E
(Permit 22 239008 BLD 00 BA) Reducing parking access ramp width from 5.5m to 3.5m due to new gas meter and bollards. The new gas meter was required by Enbridge to meet building systems demands.
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
(Permit 22 239008 BLD 00 BA) Reducing parking access ramp width from 5.5m to 3.5m due to new gas meter and bollards. The new gas meter was required by Enbridge to meet building systems demands.
Proposal for alteration of existing sprinkler and standpipe systems
Plumbing - Proposed demolition of existing front main entrance steps to facilitate construction of new stairs and accessible ramp at main entrance
Removal of existing entrance steps and construction of new stairs and accessible ramp.[27NOV2022 applicant advises that work start is delayed pending TTC construction]
Fire protection sprinkler system alterations - permit 21 229090
Install one mag lock on second floor and connect to existing maglock power supply.
HVAC - Interior alterations to existing office space on the 4th floor.
HVAC - Proposed interior alterations to 1st and 2nd floors. Single tenant
Proposed interior alterations to 1st and 2nd floors. Single tenant
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.