71 FRONT ST W
To permit a group of market style units to be constructed without internal fire separations and to beconsidered a suite. The original alternative solution had two groups of market style units.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
To permit a group of market style units to be constructed without internal fire separations and to beconsidered a suite. The original alternative solution had two groups of market style units.
Plumbing - Proposal for interior alterations to re-demise commercial retail units.
HVAC - Proposal for interior alterations to re-demise commercial retail units.
Proposal for interior alterations to re-demise commercial retail units.
The 1970s Trainshed Removal project consists of the dismantling of the 1970s Trainshed structure and construction of a new south façade at the exposed 1930s.
HVAC - Proposal for interior alterations (Architectural, electrical, mechanical, IT and Security) to the signal bunker and associated service rooms, as well as the areas in between required to be a…
Drain - Proposal for interior alterations (Architectural, electrical, mechanical, IT and Security) to the signal bunker and associated service rooms, as well as the areas in between required to be …
Plumbing - Proposal for interior alterations (Architectural, electrical, mechanical, IT and Security) to the signal bunker and associated service rooms, as well as the areas in between required to …
Proposal for interior alterations (Architectural, electrical, mechanical, IT and Security) to the signal bunker and associated service rooms, as well as the areas in between required to be accessed…
PROPOSAL INTERIOR ALTERATION FOR MERCANTILE TAKE OUT 1. EXISITNG DEMISING WALL TO REMAIN WITH NO CHANGES2. NEW FOH FINISHES AND FIXTURES 3. REPLACED PLUMBING AND HVAC FIXTURES
Plumbing - PROPOSAL INTERIOR ALTERATION FOR MERCANTILE TAKE OUT 1. EXISITNG DEMISING WALL TO REMAIN WITH NO CHANGES2. NEW FOH FINISHES AND FIXTURES 3. REPLACED PLUMBING AND HVAC FIXTURES
HVAC - PROPOSAL INTERIOR ALTERATION FOR MERCANTILE TAKE OUT 1. EXISITNG DEMISING WALL TO REMAIN WITH NO CHANGES2. NEW FOH FINISHES AND FIXTURES 3. REPLACED PLUMBING AND HVAC FIXTURES
Proposed fire alarm panel upgrade (EST3 to EST 4) at Union Station
REV 01 - Revision to permit to account for added 100 mm dia. excess steam pumped condensate pipe routing and connection to existing City of Toronto 350mm dia. sanitary inside the MOAT. Updated rout…
REV 01 - Revision to permit to account for added 100 mm dia. excess steam pumped condensate pipe routing and connection to existing City of Toronto 350mm dia. sanitary inside the MOAT. Updated rout…
Plumbing - Proposal for interior alterations for future retail space to suit head lessee work - UNIT CRU 372 (YORK STREET PROMENADE)Convenience address is 65 Front St W.
Proposal for interior alterations for future retail space to suit head lessee work - UNIT CRU 372 (YORK STREET PROMENADE)Convenience address is 65 Front St W.
HVAC - Proposal for interior alterations for future retail space to suit head lessee work - UNIT CRU 372 (YORK STREET PROMENADE)Convenience address is 65 Front St W.
FS - Commercial Kitchen Exhaust Exitinguishing Shop Drawings - Mechanical, electrical, and IT services implemented north of USEP project limit (10 ft North of 1929 wall) for running the conduit/pip…
Mechanical, electrical, and IT services implemented north of USEP project limit (10 ft North of 1929 wall) for running the conduit/pipes, to occur concurrently with USEP construction to accelerate …
Page numbers are hidden until the total count is available from the data service.