73 ST GEORGE ST
Rev 02: changes to add additional stairs into scope - Restoration of Exterior Stairs Phase 4REV - Proposed restorartion of exterior stairs phase 3
Showing first 13 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 02: changes to add additional stairs into scope - Restoration of Exterior Stairs Phase 4REV - Proposed restorartion of exterior stairs phase 3
REV - Proposed restorartion of exterior stairs phase 3
Proposed restorartion of exterior stairs phase 2
FS - Sprinkler Shop Drawing - Proposal for interior alterations to existing womens washrooms located in the basement level of Morrison Hall/Sir Daniel Wilson Student Residence.
Plumbing - Proposal for interior alterations to existing womens washrooms located in the basement level of Morrison Hall/Sir Daniel Wilson Student Residence.
HVAC - Proposal for interior alterations to existing womens washrooms located in the basement level of Morrison Hall/Sir Daniel Wilson Student Residence.
Revision to change from glycol from to dry pipe To install sprinklers,part pf application # 03-175214 bld.
To install sprinklers,part pf application # 03-175214 bld.
Structural framing in connection with 03-175214 BLD.
Partial permit in connection with B.P.#03-175214 for foundations and footings, all structural works up to and including ground floor slab.
HVAC - Construct new 272 bed student residence building & ancillary kitchen/serving facility-University College Campus. - New BuildingFOR PLANS SEE BUILDING PERMIT FILE.
Construct new 272 bed student residence building & ancillary kitchen/serving facility-University College Campus.
Partial Demolish existing 1-storey kitchen & servery portion of the building.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.