750 SPADINA AVE
Proposal to enlarge existing landing and construct new concrete ramp at existing secondary entrance
Showing at least 1–19 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to enlarge existing landing and construct new concrete ramp at existing secondary entrance
Replacement of Pool Dry-O-Tron System to existing Community Centre - Miles Nadal Jewish Community Centre
Proposal for the installation of a kitchen hood system. Unit 3.
REV - 01 - HVAC - New drawings submitted for review. - Proposal for interior alterations to the pool area in the existing building.
HVAC - Proposal for interior alterations to the pool area of the existing building
Proposal for interior alterations to the pool area of the existing building
Plumbing - Proposal for interior alterations to the pool room area of the existing building
install back flow preventer
Proposal for interior alterations to the gymnasium in existing community centre - "Miles Nadal Jewish Community Center Toronto"
This is for the installation of a new kitchen exhaust canopy within unit #3 on the ground floor. This is a take out restaurant known as "PITA Q". This is a two storey multi use building/non residen…
HVAC - Interior alterations to existing classroom areas on the ground, 2nd, and 3rd floors. Downtown Jewish Day School.
Plumbing - Interior alterations to existing classroom areas on the ground, 2nd, and 3rd floors. Downtown Jewish Day School.
make interior alterations to replace existing handicapped lift with lula elevator
Interior alterations to existing classroom areas on the ground, 2nd, and 3rd floors. Downtown Jewish Day School.
alter H.V.A.C. system on all floors
Plumbing - Interior renovation (alteration) of community centre. exist amd proposed - comm centre - Interior Alterations
HVAC - alter h.v.a.c. system in existing restaurant on ground floor for new tenant. tenant: second cup. cost included in building permit. - Interior Alterations
Install fixtures:1st fl;11wb,13wc,3urinalsand 1 janitors slop sink; 2nd fl;9wb,11wc,3 urinals,and1 janitors slop sink; 3rd fl; 1 2comp sink, 7 wb, 9 wc, 3 urinals , 1 janitors slop sink cost includ…
Alter H.V.A.C. on all floorscost included in bp 01-107605
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.