797 QUEEN ST E
Proposal for alternative solution approach to code compliance for stations related to the application of emergency power.
Showing first 18 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for alternative solution approach to code compliance for stations related to the application of emergency power.
It is proposed to provide an alternative solution approach to code compliance for stations related to the application of spatial separation for exterior walls of the station of prescriptions of OBC…
Plumbing - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on a…
HVAC - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on an em…
Drain - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on an e…
Drain - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on an e…
The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on an embankmen…
Plumbing - Proposal for interior alterations to an existing fitness studio for new tenant - Oxygen Yoga + FitnessConvenience address is 1783-1785 Queen St E
Proposal for interior alterations to an existing fitness studio for new tenant - Oxygen Yoga + FitnessConvenience address is 1783-1785 Queen St E
Proposal for the replacement of the fire alarm control panel, end of line resistors, and fire fighter telephones.
HVAC - Interior alteration to existing restaurant on ground floor. (Unit #7)
Interior alteration to existing restaurant on ground floor. (Unit #7)
Install 1wash basin and 1 water closet in unit #6
Make interior alterations to retail store on ground floor to add additional employee washroom.
Plumbing - Make interior alterations to retail store on ground floor to add additional employee washroom. - Interior Alterations
alter h.v.a.c. system.see bp#00-349287
h.v.a.c. install new h.v.a.c. system on ground floor retail stores. see 411129 (n.b. building permit went for 1797 and 1781 queen st e) cost included edc
Install fixtures in proposed dental office on first floor: 2 cuspitors, 2 dental sinks, 1 w.b., 1 w.c., 2 kitchen sinks cost incl. 140781 a.p. cleared plumbing - april 18/00Tenant: Dr. N. Bitaraf
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.