87 GERRARD ST E
Revision 01: Revision to Increase fire alarm audibility by adding speakers into every bedroomReplacement of fire alarm system and addition of emergency voice communications
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01: Revision to Increase fire alarm audibility by adding speakers into every bedroomReplacement of fire alarm system and addition of emergency voice communications
HVAC - Proposal to finish interior of medical clinic
Plumbing - Proposal to finish interior of medical clinic
REC 01: Revision to floor plan to change changing room to examination room.Proposal to finish interior of medical clinic
Proposal to finish interior of medical clinic
REV HVAC - The scope of this revision is the removal of an unnecessary duct smokedetector from the controls on Electrical Drawing E1.05-B and MechanicalDrawing M6.02Interior alterations to level 3 …
REV02: Proposed revision to foundation to add additional insulation to the existing floor slab.REV 01: is limited to the area(s) bubbled to delete the proposed 2nd storey to addresses foundation ad…
Replacement of fire alarm system and addition of emergency voice communications
REV 01: is limited to the area(s) bubbled to delete the proposed 2nd storey to addresses foundation adequacy to support the 2nd floor as originally submitted, layout changes, and to extent the size…
Fire alarm system upgrade + addition of emergency voice throughout the building.
HVAC - Interior alterations to level 3 and level 4 of Toronto Metropolitan University, scope includes hvac unit upgrades
Interior alterations to level 3 and level 4 of Toronto Metropolitan University, scope includes hvac unit upgrades
Proposal to retain the ground floor of existing garage and add services and a 2nd floor to create a laneway suite. See also 23 146377 ZAP.
Plumbing - Proposal to retain the ground floor of existing garage and add services and a 2nd floor to create a laneway suite. See also 23 146377 ZAP.
Proposal for cooling plant alterations including demolition of existing chillers and cooling towers, installation of new air cooled chillers, heat exchangers and pumps in an existing university bui…
Installation of a back flow prevention device at an existing supermarket
Installation of Fire Prevention Backflow Preventer. (Sprinkler System upgrade) to Ryerson University.
Space heating and domestic hot water boilers replacement
REV #1-REVISE DRAWINGS TO USE ORIGINALLY SUBMITTED SETconstruct new 2 storey house
construct new 2 storey house
Page numbers are hidden until the total count is available from the data service.