93 SILVER BIRCH AVE
Revision: Front window in addition has been changed along with some of the strutural elements in that area of work
Showing at least 1–8 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision: Front window in addition has been changed along with some of the strutural elements in that area of work
HVAC - Interior Alteration proposed basement underpinning and finished basment, new stairs, new main floor rear door.
REV 02: Change of stairs to the south side of the building, New layout on all floors. Front ground floor/second floor addition(Zoning certificate attached). Removal and relocation of windows on the…
Drain - Interior Alteration proposed basement underpinning and finished basment, new stairs, new main floor rear door.
Revision: scope of work has been increased to include a small front entry addition that encloses a portion of the existing front porch.
Revision: scope of work has been increased to include a small front entry addition that encloses a portion of the existing front porch.
Plumbing - Interior Alteration proposed basement underpinning and finished basment, new stairs, new main floor rear door.
Interior Alteration proposed basement underpinning and finished basment, new stairs, new main floor rear door.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.