95 QUEENS QUAY E
Proposal to install certified 20x40 frame tent (Cert # 14-240256). Installation date: 22 May- 24 May 2026 inclusive
Showing first 17 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to install certified 20x40 frame tent (Cert # 14-240256). Installation date: 22 May- 24 May 2026 inclusive
Proposal to install certified tent for open doors toronto exhibit . Cert # 14-240256
Proposal for construction of a new elevated support structure/platform for a dust collector.
Propsal for temporary tent (30'x50')
HVAC - Proposal for the installation of an e-house for new switchgears to upgrade the electrical distribution system on the rooftop of an existing industrial building - Redpath Sugar
Proposed two Temporary Tents (1-30'x50', 1-30'x40') Installation May 24th, 2019 and Removal May 27th, 2019.
Three temporary tents one 30'x50' & two 30'x40', Certified No. 14-206101. Erected May 26 - May 31 2017.
Plumbing - Proposal to construct interior alterations to the office space on the 2nd and 3rd floors of the existing industrial building.
HVAC - Proposal to construct interior alterations to the office space on the 2nd and 3rd floors of the existing industrial building.
Proposal to construct interior alterations to the office space on the 2nd and 3rd floors of the existing industrial building.
Proposal for replacement of roof decking and reinforcement of roof beams.
HVAC - Proposal to install new outdoor dust collection system on the grounds of the "Redpath Sugar" factory.
Proposal to install new outdoor dust collection system on the grounds of the "Redpath Sugar" factory.
HVAC - Proposal to install new manufacturing equipment to increase efficiency and products available at the "Redpath Sugar" factory. Some temporary wall removal required to get equipment into the b…
HVAC - New 1 storey wood frame security office addition (126.34 sq.m). exisitng and proposed - industrial processing plant - Redpath sugar - Addition(s)
Plumbing - New 1 storey wood frame security office addition (126.34 sq.m). exisitng and proposed - industrial processing plant - Redpath sugar - Addition(s)
MAKE INTERIOR ALTERATIONS TO 2ND FLOOR SUGAR PROCESSING PLANT AND STORAGE BUILDING FOR LOCKER/WASHROOM AREA. EDC LISTED: HISTORICAL.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.