Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for th reconfiguration of washroom layout within Transit Control Room to increase the number of fixtures.
Proposal changed to the washrooms remain as they are and converting a janitor's closet to a universal washroom to the building, the email is attached to the examiner's processProposal for the recon…
Plumbing - Proposal for th reconfiguration of washroom layout within Transit Control Room to increase the number of fixtures.
HVAC - Modification to Hillcrest Streetcar Maintenance and Storage Facility to accommodate the new LFLRV streetcars, this includes:1. Modification to Hillcrest Yard track layout and OCS (Overhead C…
Drain - Modification to Hillcrest Streetcar Maintenance and Storage Facility to accommodate the new LFLRV streetcars, this includes:1. Modification to Hillcrest Yard track layout and OCS (Overhead …
Modification to Hillcrest Streetcar Maintenance and Storage Facility to accommodate the new LFLRV streetcars, this includes:1. Modification to Hillcrest Yard track layout and OCS (Overhead Catenary…
Plumbing - Modification to Hillcrest Streetcar Maintenance and Storage Facility to accommodate the new LFLRV streetcars, this includes:1. Modification to Hillcrest Yard track layout and OCS (Overhe…
Revision 01 - addition to fire/heat detectors and connection of elevator to FA panel as per bubbled areasPassenger elevator overhaul in existing building. Scope includes: Addition of fire/heat dete…
Replacement of 29 bus hoists in the pits and associated controls/plumbings and drainage
Plumbing - Replacement of 29 bus hoists in the pits and associated controls/plumbings and drainage
Drain - Replacement of 29 bus hoists in the pits and associated controls/plumbings and drainage
Revision 01 - addition to fire/heat detectors and connection of elevator to FA panel as per bubbled areasPassenger elevator overhaul in existing building. Scope includes: Addition of fire/heat dete…
Passenger elevator overhaul in existing building. Scope includes: Addition of fire/heat detectors and connection of elev. to FA panel for automatic recall (BLD). New evaporator and condensing units…
Proposal to install a backwater valve in an existing transit station.Convenience address is 1138 Bathurst St.
Proposed alteration and addition of standby generator for emergency power and install barrier fall arrest on the roof.
Provide cold water supply to 2 hot water immersion tanks with backflow prevention device.
HVAC - Proposal for interior alterations to modify an existing 3rd floor training department storage room - TTC Inglis Building. Convenience address is 1138 Bathurst Street.
Proposal for interior alterations to modify an existing 3rd floor training department storage room - TTC Inglis Building. Convenience address is 1138 Bathurst Street.
FIRE SPRINKLER SYSTEM - FOR THE LOADING DOCK
Page numbers are hidden until the total count is available from the data service.