Showing first 17 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
To erect and display eight illuminated wall sign.***SEQUENCE CONDOMINIUMS***
Part Permit - Construct 27 storey residential condonimum, 2 level underground parking garage, BLOCK C PHASE 1
Part Permit - Construct 21 storey residential condonimum, 2 level underground parking garage, BLOCK B , BUILDING 2
Drain - Construct 21 storey residential condonimum, 2 level underground parking garage, BLOCK B , BUILDING 2
Drain - Construct 27 storey residential condonimum, 2 level underground parking garage, BLOCK C PHASE 1
HVAC - Construct 27 storey residential condonimum, 2 level underground parking garage, BLOCK C PHASE 1
Construct 27 storey residential condonimum, 2 level underground parking garage, BLOCK C PHASE 1
Plumbing - Construct 27 storey residential condonimum, 2 level underground parking garage, BLOCK C PHASE 1
Construct 21 storey residential condonimum, 2 level underground parking garage, BLOCK B , BUILDING 2
HVAC - Construct 21 storey residential condonimum, 2 level underground parking garage, BLOCK B , BUILDING 2
Plumbing - Construct 21 storey residential condonimum, 2 level underground parking garage, BLOCK B , BUILDING 2
Revision 01. Proposed Presentation Centre for the upcoming high rise residential building. Add interior partitions for functional rooms, build two (2) bathrooms at the existing bathroom location, m…
FS - Sprinkler Shop Drawing - Proposed Presentation Centre for the upcoming high rise residential building. Add interior partitions for functional rooms, build two (2) bathrooms at the existing bat…
Proposal for exterior wall Recladding including removal of decorative cladding and new EIFS for Unit 1.
Proposed Presentation Centre for the upcoming high rise residential building. Add interior partitions for functional rooms, build two (2) bathrooms at the existing bathroom location, modify existin…
HVAC - Add interior partitions for functional rooms, build two (2) bathrooms at the existing bathroom location, modify existing sprinkler system and HVAC
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.