131 BLOOR ST W
Renovation of an existing third-level outdoor deck including new decking and OBC-compliant guards for an existing private school.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Renovation of an existing third-level outdoor deck including new decking and OBC-compliant guards for an existing private school.
LOCALIZED REPAIRS TO THE SUSPENDED GARAGE ROOF SLAB STRUCTURE ALONG THE SOUTH AND EAST LANEWAYS AND A WHOLESALE REPLACEMENT OF THE EXISTING SURFACE FINISHES AND WATERPROOFING SYSTEMS ON THE SURFACE…
FS - Sprinkler Shop Drawing - Proposed Interior Demolition for proposed work ( rempval of tenant floor finishes, tenant ceiling and tenant interior partitions, removal of existing demising wall bet…
Revision 01- Partial concrete slab replacement at buried garage roof slab. Proposal for concrete repairs for existing parking garage
HVAC - Proposal for interior alterations for universal washroom for retail store unit 113
Proposal for interior alterations for universal washroom for retail store unit 113
Plumbing - Proposal for interior alterations for universal washroom for retail store unit 113
Proposal for concrete repairs for existing parking garage
HVAC - Proposal for interior alterations to retail units 107 + 208 in existing retail stores "Cartier"
Proposal for interior alterations to retail units 107 + 208 in existing retail stores "Cartier"
Proposal for concrete repairs to the exterior entrance ramp to the parking garage in an existing mixed use building.
Revision to remove 1 mag lock. Also see BLD, PLB, and HVA revisions to main pemrit 17 262705.
Proposal for west exterior stair repairs to the conventionally reinforced concrete stairs, repairs to the heritage designated concrete cladding, replacement of waterproofing, localized replacement …
Proposal to install 3 mag locks within existing retail space in connection to 17 262705 BLD.
FS - Sprinkler Shop Drawing - Proposed interior alterations to change the use from office to a school. "Rosedale Day School"
Proposal to install sprinkler system to the entire 4th floor of existing mixed-use building.
Install new sprinklers as per tenant layout (650m2) Relocate and install fire hose cabinet,
HVAC - Proposed interior alterations to change the use from office to a school. "Rosedale Day School"
proposal concrete repairs to vent shaft and interior stairwell gar rail repairs.
Revision 1: changes to the layout on the first floorProposal for interior alterations to ground floor and unit 206 in existing retail unit.
Page numbers are hidden until the total count is available from the data service.