145 WELLINGTON ST W
Modification of existing installed HVAC to add an additional HVAC zone via the installation of a new terminal box and rebalancing of the local ductwork.
Showing first 6 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Modification of existing installed HVAC to add an additional HVAC zone via the installation of a new terminal box and rebalancing of the local ductwork.
HVAC - Interior alteration to offices in Suite 203, creation of a new meeting room and installation of a movable wall.
Proposal to install 1 maglock on the 4th floor - "CMLS FINANCIAL".
Parking garage concrete slab repairs.
alter existing h.v.a.c system on portion of 3th fl . unit 300 & portion of 4th floors, unit 400--cost incl. under file #00-333474
INSTALL PLUMBING FIXTURES ON 3RD FLOOR: 1 K.S., 1 H.W.T., ON 4TH FLOOR: 1 K.S., 1 H.W.T., ON 5TH FLOOR: 2 K.S., 2 H.W.T. REFER TO APPLICATION NUMBER: 411912 TENANT: AON CONSULTING INC. EDC
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.