120 PETER ST
Drain - Proposal for construction of 40-storey condominium building with 385 units
Some text filters were temporarily ignored because the data service timed out.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Drain - Proposal for construction of 40-storey condominium building with 385 units
REV02: Proposal to create an additional unit from 4-plex to 5-plex.REV 01: proposed revision to underpin the existing basement. (86.5m)To alter the existing two-storey semi-detached building by con…
Revision to the interior layout to unit 4Revision 01: Revision to permit to revise the rear exterior wall assembly to 45 min. fire resistance rating
REV03: Proposed revision to the existing building permit 25 132856 BLD. Change to the exterior wall "W4"Rev 02: Section Detail at stair to maintain continuous fire separation as discussed at the si…
REV01: MODIFICATION INCLUDING INTERIOR STAIRS, INTERIOR PARTITIONWALLS, PLUMBING FIXTURE LOCATION, ADD A NEW WINDOW AT WEST SIDE GROUNDFLOOR, CHANGES REFLECTED ON STRUCTURAL, MECHANICAL, PLUMBING A…
REV01: MODIFICATION INCLUDING INTERIOR STAIRS, INTERIOR PARTITIONWALLS, PLUMBING FIXTURE LOCATION, ADD A NEW WINDOW AT WEST SIDE GROUNDFLOOR, CHANGES REFLECTED ON STRUCTURAL, MECHANICAL, PLUMBING A…
Revision No.1:HVAC - Proposal to construct a new one-storey front addition, a two-storey west side addition, reconfigure/ rebuild roof over existing second storey and a new front covered porch.
Conditional Permit - Part Permit - To construct 10 storey mixed use with 2 levels under ground parking garage, containing 271 units
REV: Proposed east and west elevations updated, wall hatch updated on section, roof canopy on west side deleted, north wall type revised.Proposal to construct a new two storey laneway suite in the …
REV: Proposed east and west elevations updated, wall hatch updated on plan, roof canopy on west side deletedProposal to construct a new two storey laneway suite in the rear yard. Related Permit #25…
Part Permit - Proposal to construct 20 storey, 553 Unit (706 Beds), Student Residence building with retail on ground floor.
Drain - Resources Road Logistic Hub consists of two single-story, pre-assembled modular trailers. These trailers are connected by an exterior elevated walkway, served by three access points: stairs…
HVAC - Proposal to construct a two storey garden suite.
HVAC - PROPOSAL FOR A NEW ATTACHED GARAGE ADDITION, A REAR ADDITION, AND A SECOND-STOREY ADDITION TO THE EXISTING DWELLING UNIT.
Drain - Proposal to convert the existing attached garage into habitable space with a second-storey addition above, and to undertake interior alterations to the existing dwelling to create a four-un…
Plumbing - Relocation and Remodelling of existing 3 pc washroom and laundry machine / dryer / sink to reconfigured area in same basement floor
Rev 01 - New entrance and minor layout changes.Interior alterations - Canna North Store - First Floor 117
Revision 1: Proposed two-storey single family detached dwelling with two car integral garage, 2 covered porch,balcony and walk-out basement stair.
Revision to add the 3rd floor.Proposal to construct a two storey dwelling.
REV01: Proposed revision changes to the opening dimensions and structure of the existing masonry wall and location of proposed south wall of the addition.Proposed partial underpinning, interior alt…
Page numbers are hidden until the total count is available from the data service.