150 BOROUGH DR
Localized concrete repairs, localized waterproofing system replacement, on-grade staircase replacement, floor drain replacement, installation of new crystalline waterproofing, and interlock or ston…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Localized concrete repairs, localized waterproofing system replacement, on-grade staircase replacement, floor drain replacement, installation of new crystalline waterproofing, and interlock or ston…
Proposal for roof replacement
Proposal for repairs to precast concrete panels above the loading dock area and localized concrete repair to loading dock beam.
Replacement of an existing cooling tower with associated control and power wiring, piping, valves, and other associated accessories.
Proposal for 4th stair security door/gate
Two scaffold towers that are 10 feet wide x 10 feet long x 23 feet 5.75 inches high with 21 feet between the towers to hang a 20.8' feet long and 16.6' feet high LED Video Wall. Light fixtures will…
replace boilers, humidifiers, pumps
Proposed Interior Alterations to entire building to comply with AODA requirements and City of Toronto Accessibility Design Guidelines. Remove steps in councillor meeting hall, new ramp, new lift, n…
Plumbing - Proposed Interior Alterations to entire building to comply with AODA requirements and City of Toronto Accessibility Design Guidelines. Remove steps in councillor meeting hall, new ramp, …
HVAC - Proposed Interior Alterations to entire building to comply with AODA requirements and City of Toronto Accessibility Design Guidelines. Remove steps in councillor meeting hall, new ramp, new …
Proposed site services and storm water management installation.
construct door to servery area on 3rd floor adjacent to elevator
Proposed new sprinklers for dental clinc located on ground floor.
Proposed retaining wall exceeding 1m in height. Wall measuring 2.9m from grade on the west side tapering to 1.7m from grade on the east side (top of ramp) and 19.5m long -wall not situated over sla…
Proposed upgrade to backup/emergency power fuel oil system in existing Scarborough City Hall building.
REV. #1 - Exterior ramp shown on original application has been revised to exterior stairs due to site conditions.construct a one storey City of Toronto Library
REVISION 2: additional water main work.REV #1-ADD 80 M OF PIPING, ADD 2 CATCH BASINSDrain - construct a one storey City of Toronto Library
REV #1-ADD 80 M OF PIPING, ADD 2 CATCH BASINSDrain - construct a one storey City of Toronto Library
construct new handrail at the steps leading to the STC and Federal building
Drain - construct a one storey City of Toronto Library
Page numbers are hidden until the total count is available from the data service.