150 YORK ST
REV01: Added doors to the CAFE / AUDITORIUM (300-27), revised door & hardware schedule, revised ceiling configuration from open ceiling to dropped ceiling in both the west (COFFEE / BAR: 300-10) an…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV01: Added doors to the CAFE / AUDITORIUM (300-27), revised door & hardware schedule, revised ceiling configuration from open ceiling to dropped ceiling in both the west (COFFEE / BAR: 300-10) an…
REV 01: Minor modifications to the lighting, HVAC and sprinkler layout to suit new ceiling and layout revisions.HVAC - PROPOSAL FOR INTERIOR ALTERATIONS TO A NON-RESIDENTIAL BUILDINGEXISTING OFFICE…
Adding one Maglock on 19th Floor
Revision 01: Revision to permitHVAC - Interior alterations to non-residential building existing office suite fit out - Suite 600
REV 01: Revision to Permit #25 234705 BLD 00 BA to include alternative solution to exceed the maximum floor opening size for the convenience stair connecting the 19th floor and 20th floor, with com…
This project consists of designing and installing modifications to the existing wet sprinkler system for an interior renovation on 12th floor, in an existing 20-storey building. The areas included …
PROPOSAL FOR INTERIOR ALTERATIONS TO A NON-RESIDENTIAL BUILDINGEXISTING OFFICE SUITE FIT-OUT.
HVAC - PROPOSAL FOR INTERIOR ALTERATIONS TO A NON-RESIDENTIAL BUILDINGEXISTING OFFICE SUITE FIT-OUT.
Interior alterations to non-residential building existing office suite fit out - Suite 600
HVAC - Interior alterations to non-residential building existing office suite fit out - Suite 600
HVAC - Proposed interior alterations to floors 19 & 20.
Proposed interior alterations to floors 19 & 20.
Plumbing - Proposed interior alterations to floors 19 & 20.
Rev 01: Work includes removal of interior non-load bearing walls, replacement of existing concrete topping and waterproofing system, installation of new concrete curb and block wall, and trench dra…
HVAC - Proposal for interior alterations to construct new staircase from 19th floor to 20th floor
Proposal for interior alterations to construct new staircase from 19th floor to 20th floor
HVAC - Proposal for interior alterations to office.
Proposal for interior alterations to office.
LOADING DOCK REPAIRS AND MODIFICATIONS
Proposed reconfiguration of reception and boardroom area. Additional small meeting rooms. 9th floor
Page numbers are hidden until the total count is available from the data service.