Showing first 11 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 01: INTERIOR ALTERATION ON EXISTING 2ND FLOOR AND 3RD FLOORHVAC - Build 3rd floor addition and create 2 additional dwelling units - Interior Alterations
Revision 01 - For interior alterations and to add 4 additional residentil units.Build 3rd floor addition and create 2 additional dwelling units
HVAC - Build 3rd floor addition and create 2 additional dwelling units - Interior Alterations
Build 3rd floor addition and create 2 additional dwelling units
make interior alterations on portion of 1st fl. apt. #5 & portion of 2nd fl: apt. #7
Plumbing -Relocate fixtures on 2nd floor Unit 7 - 1 wc, 1 wb, also add 1 wc, 1 wb to Unit 7 on 2nd floor. (NO PLANS) Cost included in BP02-125315 (not yet) See also BP01-198143(990) and BP01-137859…
Make interior alters to unit 7 on the second floor by erecting partitions to relocate one washroom and add one new washroom. See also BP01-198143(990) and BP01-137859(990)
alter bp 0-137859 by making interior alterations to portion of basement, 1st & 2nd floors
install fixtures: basement: 1 wb, 1 wc, 1st fl: 1 shower, 1 wb, 1 wc, 2nd fl: 1 wc, 1wb, 1 shower
Make alterations to basement to increase the number of dwelling units from 5 to 8 by converting the basement into 3 units see c of a decision
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.