188 BERMONDSEY RD
Bermondsey Transfer Station, maintenance shop and other areas supply air and heating design
Showing first 13 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Bermondsey Transfer Station, maintenance shop and other areas supply air and heating design
Construction of a new reinforced concrete recycling bunker with pre-fabircated fabic roof.Construction of a new reinforced concrete salt bunker with pre-fabricated fabric roof.
HVAC - Re-roofing of the scale house building, replace roof top a/c unit; provide one roof anchor
Re-roofing of the scale house building, replace roof top a/c unit; provide one roof anchor
installation of oil waste drainage catch basin with sump
Sprinkler shop drawings, system replacement to transfer station
2 Backflow prevention devices and thermal expansion device installations
New ramp within the building - Bermondsey Transfer station
Plumbing and site services - A new reuse and recycle building adjacent to the bermondsey transfer station
HVAC - A new reuse and recycle building adjacent to the bermondsey transfer station
A new reuse and recycle building adjacent to the bermondsey transfer station
Errect one-storey pre-assembled building for the storage of household hazerdous waste (94m2)
Construction of re-inforced concrete/steel wall to be used as a push wall for piling loading and unloading of solid waste.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.