52 PATRICK BLVD
Rev 01: revision to Permit No. 25 253923 PLB 00 PS.Plumbing - Proposal to construct garden suite at the rear yard
Some text filters were temporarily ignored because the data service timed out.
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 01: revision to Permit No. 25 253923 PLB 00 PS.Plumbing - Proposal to construct garden suite at the rear yard
Proposed demolition of more than 50% of the existing dwelling and reconstruction through renovations and a 451.49 m² addition.
Construct new 1-storey detached accessory shed (approx. 20'-11" x 14'-11") in rear yard of existing single family dwelling, on helical screw piles
Proposed Detached garage in rear yard of existing detached dwelling
Proposed site services - connection to watermain
Basement underpinning, no finishing
PROPOSED INTERIOR ALTERATIONS. ONE NEW BATHROOM IN GROUND FLOOR AND LAUNDRY IN BASEMENT. REMOVAL OF SOME NON-LOAD BERING WALLS.
To enclose the existing front porch with walls and windows for unheated porch
Proposal for underpinning and interior alterations to finish the basement
HVAC - Demolishing existing building and new construction of two storey SFD with integral garage
Deferred Fees from folder 25 110984 (RSN-5575338) ZoningProcess RSN 80858278
REVISION-01Plumbing - Interior alterations with mechanical, electrical and plumbing work to suit new layout for the model suite in suite 400.
HVAC - Proposed 1 storey garden suite
Drain - Proposed construction of the building shell and exterior envelope for the industrial expansion (Phases 1 & 2) at Gay Lea Clayson Rd. Scope includes the primary structural frame, masonry sha…
Plumbing - Proposed construction of the building shell and exterior envelope for the industrial expansion (Phases 1 & 2) at Gay Lea Clayson Rd. Scope includes the primary structural frame, masonry …
HVAC - Proposed garden suite.
HVAC - Proposed garden suite.
HVAC - Proposal to demolish existing one storey and to construct a new three-storey detached dwelling
Rev 01: Temporary reroute of sanitary drainage, temporary grey water pump & temporary toilet and macerating pump.Plumbing - Proposal for interior alterations to vacant suite. Floor 28.
Proposed Hydro Vault Repairs
Updated Nov 17, 2026