200 BLOOR ST E
HVAC - Proposal for interior alterations to existing office space - North Tower 4th Floor
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for interior alterations to existing office space - North Tower 4th Floor
HVAC - Proposal for interior alterations to existing office space - UNIT 200
Proposal for interior alterations to existing office space - North Tower 4th Floor
Proposal for interior alterations to existing office space - South Tower 6th Floor
Proposal for interior alterations to existing office space - UNIT 200
HVAC - Proposal for interior alterations to existing office space - South Tower 6th Floor
Proposal for interior alterations to existing office space on the ground loor to convert into a modern autonomous store. Convenience address is 220 Bloor St E.
HVAC - Proposal for interior alterations to existing office space on the ground loor to convert into a modern autonomous store. Convenience address is 220 Bloor St E.
FS - Sprinkler Shop Drawing - Proposal for interior alterations on 2nd floor "Manulife"
HVAC - Proposal for interior alterations on 2nd floor "Manulife"
Proposal for interior alterations to return a portion of the 2nd floor level to base building condition. (Redevelopment Phase 3)
Proposed interior alterations of ground floor level for new meeting rooms and lounge area and installation of new HVAC equipment at basement and second floor levels in existing office building.
HVAC - Proposed interior alterations of ground floor level for new meeting rooms and lounge area and installation of new HVAC equipment at basement and second floor levels in existing office building.
REV01: INCREASED PROJECT SCOPE TO INCLUDE GROUND LEVEL WASHROOMS ANDBASEMENT LEVEL ROOMS
REV 01: Increased project scope to include interior demolition for the existing ground floor level washrooms & three existing basement floor level rooms. Return to base building condition as well.P…
FS - Sprinkler Shop Drawing - Interior alterations to office space
Proposal for interior demolition of the existing ground floor level (South Tower) office use to return to base building condition for future redevelopment. Scope of work consists of demolition of n…
HVAC - Interior alterations to office space
Proposal for interior alterations to floors 8, 9, & 12 to the stairwells (hardware) located in the North Tower - "Manulife".
Proposed interior alterations to existing office unit B18. Convenience address is 220 Bloor St E.
Page numbers are hidden until the total count is available from the data service.