200 VICTORIA ST
Proposal to remove 2 Fluid Coolers, and replace with 4 Fluid Coolers, Heat Exchangers, Pumps, Expansion Tanks.
Showing first 5 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to remove 2 Fluid Coolers, and replace with 4 Fluid Coolers, Heat Exchangers, Pumps, Expansion Tanks.
Proposal to remove 2 Fluid Coolers, and replace with 4 Fluid Coolers, Heat Exchangers, Pumps, Expansion Tanks
Plumbing - Interior alteratios to 5th floor of existing hotel/condo building to convert existing spa into 10 hotel suites. Pantages Hotel. See active interior alterations/demo 17 224289 BLD.
Alter plans as approved under file 05 - 167488 by changing occupant load to conference room on 3rd floor to 335.
Occupant load increase to conference room on 3rd floor to 360 people.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.