203 CRAWFORD ST
REV: Revised location of washer/dryerProposal for multiple projects (second suite and interior alterations).
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV: Revised location of washer/dryerProposal for multiple projects (second suite and interior alterations).
Plumbing - Proposal for multiple projects (second suite and interior alterations).
Proposal for multiple projects (second suite and interior alterations).
Plumbing - Construct underpinning (140 lm), finished basement (108m2) and basement walkout
Install Mainline Fullport backwater valve and sump pumpDrain - Construct underpinning (140 lm), finished basement (108m2) and basement walkout
Construct underpinning (42.67 lm), finished basement (108m2) and basement walkout
HVAC - Proposed 3rd floor addition, Interior alterations to existing 3 storey SFD. Work to Party Wall. (See Party Wall Permit for # 204 Crawford St.)
Plumbing - Proposed 3rd floor addition, Interior alterations to existing 3 storey SFD. Work to Party Wall. (See Party Wall Permit for # 204 Crawford St.)
Proposed 3rd floor addition, Interior alterations to existing 3 storey SFD. Work to Party Wall. (See Party Wall Permit for # 205 Crawford St.)
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.