215 WICKSTEED AVE
REV01 - HVAC - TO BE REVISED DUE TO REDUCED SCOPE OF WORK.HVAC - Proposal to construct interior alterations
Showing first 13 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV01 - HVAC - TO BE REVISED DUE TO REDUCED SCOPE OF WORK.HVAC - Proposal to construct interior alterations
REV01 : TO BE REVISED DUE TO REDUCED SCOPE OF WORK.Proposal to construct interior alterations
Plumbing - Proposal for construction of infill between 215 Wicksteed Ave. and 50 Beth Nealson and office fit up for 50 Beth Nealson
HVAC - Proposal for construction of infill between 215 Wicksteed Ave. and 50 Beth Nealson and office fit up for 50 Beth Nealson
Plumbing - Proposal to construct interior alterations
HVAC - Proposal to construct interior alterations
FS - Sprinkler Shop Drawing - Proposal to construct interior alterations
Proposal to construct interior alterations
Revision includes additional 19m of storm sewer and the addition of a 38m sanitary forcemain, one sanitary manhole and associated pump station. Storm sewer inverts were revised from original permit.
Proposal for construction of infill between 215 Wicksteed Ave. and 50 Beth Nealson and office fit up for 50 Beth Nealson
Proposed installation of stormwater structures and pipes for a 1-storey industrial building addition.
HVAC - Building additios alterations, Warehouse, Interior Alterations, Change Location of Shipping Doors to west wall. seal abandoned Shipping Doors on South Wall.
Building additions alterations, Warehouse, Interior Alterations, Change Location of Shipping Doors to west wall. seal abandoned Shipping Doors on South Wall.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.