260 BAIN AVE
REV 03: Comprises a bathroom renovation, and a small addition on the 3rd floor. This addition was submitted for Zoning Review 25_143377_ZAP_00_ZR_ZAP, and approved at the Committee of Adjustment, M…
Showing first 7 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 03: Comprises a bathroom renovation, and a small addition on the 3rd floor. This addition was submitted for Zoning Review 25_143377_ZAP_00_ZR_ZAP, and approved at the Committee of Adjustment, M…
HVAC - PROPOSED INTERIOR ALTERATIONS ON MAIN FLOOR (59 SQ.M) SEC. FLOOR (59 SQ.M); THIRD FLOOR (47 SQ.M) 1 WALKOUT + 1 DECK TO A (SFD)
Removal of an existing first floor addition, building a new 3rd floor addition, underpinning, and interior renovations.
REVISION 2 - additional underpinning, changes to walkout stairs, structural design changes on all floorsPROPOSED INTERIOR ALTERATIONS ON MAIN FLOOR (59 SQ.M) SEC. FLOOR (59 SQ.M); THIRD FLOOR (47 S…
PROPOSED INTERIOR ALTERATIONS ON MAIN FLOOR (59 SQ.M) SEC. FLOOR (59 SQ.M); THIRD FLOOR (47 SQ.M) 1 WALKOUT + 1 DECK TO A (SFD)
Drain - PROPOSED INTERIOR ALTERATIONS ON MAIN FLOOR (59 SQ.M) SEC. FLOOR (59 SQ.M); THIRD FLOOR (47 SQ.M) 1 WALKOUT + 1 DECK TO A (SFD)
Plumbing - PROPOSED INTERIOR ALTERATIONS ON MAIN FLOOR (59 SQ.M) SEC. FLOOR (59 SQ.M); THIRD FLOOR (47 SQ.M) 1 WALKOUT + 1 DECK TO A (SFD)
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.