270 SHEPPARD AVE W
Proposal for the drilling of geothermal low-carbon energy system consisting of 41 boreholes. Planned drilling start date is September 2026.
Showing first 8 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for the drilling of geothermal low-carbon energy system consisting of 41 boreholes. Planned drilling start date is September 2026.
Part Permit - Proposal to construction of two below-grade parking levels, and a 9-storey mixed-use building (purpose-built rental with ground-floor retail).
HVAC - Proposal to construction of two below-grade parking levels, and a 9-storey mixed-use building (purpose-built rental with ground-floor retail).
Proposal to construction of two below-grade parking levels, and a 9-storey mixed-use building (purpose-built rental with ground-floor retail).See also 19-232233 SA
Drain - Proposal to construction of two below-grade parking levels, and a 9-storey mixed-use building (purpose-built rental with ground-floor retail).
Plumbing - Proposal to construction of two below-grade parking levels, and a 9-storey mixed-use building (purpose-built rental with ground-floor retail).
Proposal to demolish existing house and convert lot into public parking.
Demolition of a existing single family dwelling. For the proposeal to construct a 9-storey mixed use building containing retail uses at-grade and residential uses above.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.