135 ST GEORGE ST
Proposal for installation of temporary tents ONE 20'x110' Tent Cert# 25 135948 000 00 and ONE 6'X20' Tent Cert#25 135599 000 00 for a fashion show event. Anchoring will be staked into the surroundi…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for installation of temporary tents ONE 20'x110' Tent Cert# 25 135948 000 00 and ONE 6'X20' Tent Cert#25 135599 000 00 for a fashion show event. Anchoring will be staked into the surroundi…
HVAC - PROPOSED INTERIOR FIT-OUT OF ROOM GB #043 IN THE BASEMENT OF THE GAILBRAITH BUILDING.The space is currently used partially for storage of electrical research equipment (80%) and as an electr…
PROPOSED INTERIOR FIT-OUT OF ROOM GB #043 IN THE BASEMENT OF THE GAILBRAITH BUILDING.The space is currently used partially for storage of electrical research equipment (80%) and as an electrical la…
Proposed installation of sprinklers
Drain - Proposal for renovation and minor modifications to washrooms and interior members' lounge space -relocation of bar
REVISION 01: adding two additional vanity sinks to the plumbing count.Plumbing - Proposal for renovation and minor modifications to washrooms and interior members' lounge space -relocation of bar
HVAC - Proposal to construct an addition & new seasonal ancillary pavilion.
Proposal to construct an addition & new seasonal ancillary pavilion.
Plumbing - Proposal to construct an addition & new seasonal ancillary pavilion.
Plumbing - Proposal for renovation and minor modifications to washrooms and interior members' lounge space -relocation of bar
Proposal for renovation and minor modifications to washrooms and interior members' lounge space -relocation of bar
propose to renovate washrooms in 4th floor
To repair the damaged retaining wall. Vehicle impact damage to the masonry (retaining) wall on the perimeter of the property - The York Club
HVAC - Interior alterations to University offices including mechanical, electrical and interior finishes changes
Interior alterations to University offices including mechanical, electrical and interior finishes changes
Asbestos and mold containing demolition. All walls, mechanical, electrical and fireproofing in room 31 are to be removed as indicated in the drawing sets to leave the space asbestos free. The futur…
Backflow Prevention Devices (Water only)
Proposal to install three new AHU roof top unit and ventilation upgrade
Proposal for interior alterations to an existing lab on the 4th floor located in the Galbraith Building - U of T, Nano-materials for Energy Lab
HVAC - Proposal for interior alterations to an existing lab on the 4th floor located in the Galbraith Building - U of T, Nonomaterials for Energy Lab
Page numbers are hidden until the total count is available from the data service.