Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed interior alteration of an office suite. Construction of interior non-load bearing partitions and finishes . Mechanical and Electrical alterations to suit new layout.
Plumbing - Proposed interior alteration of an office suite. Construction of interior non-load bearing partitions and finishes. Mechanical and Electrical alterations to suit new layout.
HVAC - Proposed interior alteration of an office suite. Construction of interior non-load bearing partitions and finishes. Mechanical and Electrical alterations to suit new layout.
Interior alterations to office space
Proposal for interior alterations to existing office space on the 5th floor
Interior alterations to ground floor and mezzanine for tenant fit out of a new restaurant . Occupant load 78 people (by design)
Proposal for interior alterations to existing bank - CIBC
FS - Sprinkler Shop Drawing - Proposal for interior alterstions to existing office space on the 5th floor - Unit 500, "Integrate.AI"
HVAC - Proposal to construct an underground tunnel from level P2 to the TTC concourse. Existing north-west exit from Patrick Station to be extended through the mixed use building under construction.
Proposal to construct an underground tunnel from level P2 to the TTC concourse. Existing north-west exit from Patrick Station to be extended through the mixed use building under construction.
Installation of two magnetic locks on each of the 2nd and 4th floor
Proposal for interior alterations to the 7th floor - Tenant is "Paramed".
This is for interior alterations to the second(2nd) floor for a new office layout via interior alterations. This is for "PUBLIC HEALTH ONTARIO". This will include HVAC and Plumbing.
Interior alterations to existing office space on the 4th floor.
installation of a 4" backflow prevention device within the P2 - basement mechanical room. This is a multi use non residential building
permit for 4 maglocks on floor 9 of existing office space - OHAAP
Plumbing - Proposal for interior alterations to fit-out new tenant on third and partially the fourth floor existing offices (1889m2). New tenant: Ontario Agency for Health Protection and Promotion.
Interior alterations to exiting office space - floor 10 - suite 1014
Interior alterations to existing office space - 17 floor.
Page numbers are hidden until the total count is available from the data service.