50 GOULD ST
Temporary structure / mobile stage for TMU Student Orientation as per site plan
- Permit number
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Temporary structure / mobile stage for TMU Student Orientation as per site plan
Proposal to erect temporary mobile stage for TMU Orientation inside the TMU Community Park as per site plan. Aug.24-Aug.29 2025
Revision to replacement of existing steam condensate tank.Installation of new relief vent for existing condensate receiver tank.
replace make up air unit and exhaust fans
Plumbing - The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting,updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-…
Installation of new relief vent for existing condensate receiver tank.
Proposal to replace the existing diesel generator with a new 200 KW natural gas generator at the existing university "Ryerson University".
HVAC - Proposal to replace the existing diesel generator with a new 200 KW natural gas generator at the existing university "Ryerson University".
Proposal to provide new 1.2 m x 1.2 m opening in existing concrete wall for new interior window installation.
FS - Sprinkler Shop Drawing - Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, conv…
Plumbing - Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is …
Proposal to demolish and remove abandoned boilers and associated piping, accessories and electrical service in the existing university building, convenience address is 350 Victoria Street.
Plumbing - Proposal for interior alterations to provide a caged area within an existing storage room for chemical storage.
Make interior alterations to second floor of Kerr Hall (Ryerson).
HVAC - Make interior alterations to second floor of Kerr Hall (Ryerson).
Stand alone mechanical work for existing university chemistry lab - KHN 106 - Ac unit and roof top unit - exhaust system.
Interior Alterations to existing Fitness Centre - Ryerson University (RAC) - Barrier Free Alterations.
Plumbing - Interior Alterations to existing Fitness Centre - Ryerson University (RAC) - Barrier Free Alterations.
HVAC - Installation of new Emergency Generator and Interior alterations to existing Mech. Penthouse.See 02-109590 BLD for initial Emergency Generator Install.
HVAC - Interior alterations to part of 3rd floor, Unit KHN 302 - Interior Alterations
Page numbers are hidden until the total count is available from the data service.