64 KING ST
Rev 02 - Proposal to revise basement conditions and associated fire separation requirements. See attached memo for all the revisions made to original plans.Rev 01 - Proposed changes to the driveway…
Showing first 17 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 02 - Proposal to revise basement conditions and associated fire separation requirements. See attached memo for all the revisions made to original plans.Rev 01 - Proposed changes to the driveway…
Deferred Fees from folder 24 171062 (RSN-5464209) ZoningProcess RSN 77594996
Drain - Proposal for interior renovation to change the existing building into four-unit dwelling, addition of new exterior stairs and partial porch reconstruction.
Plumbing - Proposal for interior renovation to change the existing building into four-unit dwelling, addition of new exterior stairs and partial porch reconstruction.
Rev 01 - Proposed changes to the driveway and the walkway from Rosemount Ave, deletion of a window from second floor, changes to the basement under the rear wing, and changes to the layout. Please …
HVAC - Proposal for interior renovation to change the existing building into four-unit dwelling, addition of new exterior stairs and partial porch reconstruction.
Proposal for interior alterations to convert powder room to full washroom on 3rd floor, change size of bedroom #4 and closet addition to bedroom #3.
Proposal for interior renovation to change the existing building into four-unit dwelling, addition of new exterior stairs and partial porch reconstruction.
Plumbing - Three storey dwelling containing four dwelling units, front porch, rear deck, rear walkout and exit stairs, created through consent.
HVAC - Three storey dwelling containing four dwelling units, front porch, rear deck, rear walkout and exit stairs, created through consent.
Three storey dwelling containing four dwelling units, front porch, rear deck, rear walkout and exit stairs, created through consent.
Plumbing - Proposed interior alteration to existing office
Proposed interior alteration to existing convert exiting office to SFD complete with basement underpinning.
Temporary Structure to promote products install September 24, 2021 and remove October 10, 2021
Proposal to sever the existing lot and build a two storey detached house - PART 2 (severed)
Proposal to sever the existing lot and maintain existing detached building. Existing vacant building to be converted to a single family dwelling - PART 1 (retained)
Alter existing front facade of the building.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.